Laserfiche WebLink
IVIINUTES OF THE ORONO PLANNING COMXDSSION <br />MEETING HELD ON JUNE 17, 1996 <br />(#4) #2138 JOAN AND WILLIAM WROBLEWSKI^ 630 PARK LANE - <br />VARIAxVCES - PUBLIC HEARING - 7:58-8:03 P.M. <br />The Affidavit of Publication and Certificate of Mailing were noted <br />The Applicant was present <br />Gaffion reported that the application was for a request for hardcover, front setback, and <br />lot coverage variances to enclose an existing concrete slab porch, which was originally <br />approv ed and constructed in 1990. No roof or walls were planned for at that time. The <br />proposed enclosure will include extending the roof The lot coverage allowed at 15% is <br />currently at 26 8%. The lot is small, and lot coverage would increase with this proposal to <br />27.7^0 The front setback is currently at 37. The proposal is for a 33 2* setback, which <br />would result in a 18' variance from the 35' standard There is no change in the hardcover <br />percentage at 44 45^o. The change is in the nature of the hardcover with the proposed <br />structure above the slab. <br />Hawn said she saw the screening as reasonable, noting there was no outdoor seating area <br />available. <br />The applicant had no comments <br />There were no public comments <br />Hawn moved, Lindquist seconded, to approv e the enclosure of the existing concrete sl^ <br />with screening Vote. Ayes 7, Nays 0. <br />(#5) #2140 TROY ANDERSON* 1490 LONG LAKE BOULEVARD - VARIANCES <br />- PUBUC HEARING - 8:03-8:08 P.M. <br />The Affidavit of Publication and Certificate of Mailing w ere noted <br />The Applicant was present <br />Mabusth reported that the applicant previously received a v'ariance for a second story <br />addition from the 50' street setback and a side variance for an attached garage. The <br />applicant now proposes a family room addition to the west side of the residence and entry <br />additions to the north and south sides. The street setback currently exists at 35.1 % and is <br />proposed at 30' The covered entry is proposed 42' from the street A new rear entry <br />would meet the required 50' setback from the rear lot line. The structures meet the <br />hardcover requirements. Mabusth noted that a new ’ septic was installed in 1993. <br />Lindquist commented that the property is attractive.