My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 7401
Orono
>
Resolutions, Ordinances, Proclamations
>
Resolutions
>
Resolution 7401
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2023 11:45:36 AM
Creation date
9/12/2023 11:45:36 AM
Metadata
Fields
Template:
Address
House Number
3017
Street Name
North Shore
Street Type
Drive
Address
3017 North Shore Drive
Document Type
Resolutions
Permit Number
LA23-000040
PIN
0911723320002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF ORONO <br /> RESOLUTION OF THE CITY COUNCIL <br /> NO. 7401 <br /> �kESHOF`� <br /> 1) Development within SWAN BEACH ON CRYSTAL BAY is subject to the Conclusions, <br /> Orders and Conditions enumerated within Preliminary Plat Resolution No 7365. <br /> 2) Dedication on the plat of the perimeter Drainage and Utility Easements as required in <br /> Resolution 7365. <br /> 3) Executed Driveway Easement and Maintenance Agreements. <br /> 4) Executed Trail Easement. <br /> 5) The approvals granted in this Resolution shall become effective only when all conditions of <br /> approval requiring actions by the Developers have been satisfied. <br /> 6) Minnehaha Creek Watershed District (MCWD) approved permits for the grading, stormwater <br /> management facilities, storm water pollution prevention plan (SWPPP) and erosion control <br /> plan shall be submitted. <br /> 7) A title opinion for the Property and certified copies of all recorded easements currently <br /> affecting the Property shall be submitted. <br /> 8) Payment of Development Fees Required: $65,571.01 <br /> a. City Sanitary Sewer Connection Fee: $5,800.00. <br /> b. Park Dedication Fee: $54,520.01 <br /> c. Stormwater and Drainage Trunk Fee: $5,250.00 <br /> 9) Payment of the following are required at the time of building permit for Lot 1 and Lot 2, Block <br /> 1, SWAN BEACH ON CRYSTAL BAY: <br /> a. Sewer Connection Permit: $50.00 per lot(due at the time of individual building permits) <br /> b. Sewer Connection Inspection fee: $100 per lot (due at the time of individual building <br /> permits). <br /> c. Metropolitan Council SAC fee at the time of sewer connection. $2,485.00 due at time <br /> building permit. <br /> 10)The City Clerk shall release the plat documents for filing only upon certification by the City <br /> Attorney, Community Development Director, and City Engineer that all requirements of the <br /> platting regulations have been satisfied. <br /> 11)The aforesaid plat shall be filed by the City of Orono with Hennepin County on or before <br /> September 11, 2024, together with a certified original copy of this resolution and executed <br /> copies of the easements and covenants pertinent thereto. <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.