My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-16-1996 Planning Packet
Orono
>
Planning Commission
>
1996
>
01-16-1996 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/7/2023 2:51:34 PM
Creation date
9/7/2023 2:43:21 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
411
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Request for Council Action continued <br />page 2 of 3 <br />March 8, 1995 <br />Sewer Connection - Maeser <br />Additional Information <br />Exhibit B defines the City ’s stated position on this matter based on code <br />requirements, past City actions, and past actions by the current and previous <br />property owners. <br />Three of the four options proposed by staff for resolving the issue require City <br />Council approval. <br />Additional exhibits have been provided as further background on this issue. <br />While the cabins are not falling down, staff las been called on by tenants in the <br />past to deal with substandard electrical wiring in the cabins, which was repaired. <br />Staff has concluded that the nonconforming use sections of the code technically <br />could apply to these cabins, and that their nonconforming use for rental purposes <br />could have been required to cease as early as 1978. <br />The current owner purchased this property in 1985 <br />Staff Recommendation <br />Given that this 2-acre property in a 2-acre zone is too small to subdivide, and given the property <br />owner’s understandable reluctance to spend nearly S28,000 to connect the cabins to sewer, staff <br />would recommend that Option 4 of Exhibit B be conceptually approved via execution of an <br />agreement to be drafted by the applicant’s attorney and approved by the City Attorney, <br />containing as a minimum, the following conditions: <br />1. The principal residence shall be connected to municipal sewer within 90 days <br />The two cabins shall be connected to the municipal sewer within 90 days. Such <br />connection shall be a separate connection from the principal residence connection. <br />3.Connection of the cabins to municipal sewer is considered temporary, and such <br />connection is allowed for a period of___years. At the end of-------years, the <br />property owner shall remove said connection, remove plumbing from the cabins, <br />_fonfoi iic#» nf fhp rahini? The cabins then shall either be removed <br />property owner snaii remuve -------- <br />and discontinue rental use of the cabins. The cabins then shall either be removed <br />from the property or moved to a location on the property that conforms with all <br />provisions of the Orono Zoning Code governing the location and use of accessory <br />storage structures. <br />I
The URL can be used to link to this page
Your browser does not support the video tag.