Laserfiche WebLink
Zoning File #2070 <br />September 15, 1995 <br />Page 3 <br />Parcel A <br />Proposed Required <br />Parcel B <br />Proposed Required <br />Standard <br />Lot area:0.93 ac.2.0 ac.1.06 ac.3.0 ac (backlot) <br />Lot width: <br />- at street setback <br />- at shoreline <br />- at 75’ setback <br />N/A N/A <br />297 ’ 200 ’ <br />190’±* <br />310’ <br />235 ’ <br />200’ <br />200’ <br />200’- at 262’ 200 ’ <br />*Note: As a newly created "back lot". Parcel B’s access corridor would have ^ be a 30 <br />oullot, and it’s defined street lot line is the NW-SE line separating Parcels A & B. <br />Setbacks: <br />- North <br />- South <br />- East <br />-West <br />30’ <br />75’ <br />50’ <br />50’ <br />30’ <br />75’ <br />30’ <br />50’ <br />30’ <br />75’ <br />75’ <br />30’ <br />30’ <br />75’ <br />75’ <br />50’* <br />These two setbacks can easily be met. <br />Hardcover allowance: <br />- 0-75’ 0- s f- <br />- 75-250 ’ 4,800 s.f.± <br />♦Excludes area of 12 ’x222 ’ driveway corridor, which could reduce this allowance significantly <br />if corridor is part of Parcel B instead of a separate outlet <br />0 s.f. <br />4,750 s.f.±* <br />• • • <br />Lot coverage by structures <br />allowance (15%) 6,075 s.f. <br />- Note that in both cases this exceeds allowed hardcover. <br />6,925 s.f. <br />Additionally, any structure placed on Parcel B will need an average lakeshore setback variance <br />Municipal Sewer <br />As part of the Stubbs Bay project, this group of three properties was assessed only one sewer <br />udt to seJve *7«ist4 house. The City Council had earlier concluded that tt was not <br />appropriate to provide sewer to the existmg non-conformmg cabins. <br />If the proposed lot line rearrangement/ replat was approved, a sewer connection charge of <br />$13,097.00 (1995 fee schedule) would have to be collected for the second umt.