My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-15-1996 Planning Packet
Orono
>
Planning Commission
>
1996
>
04-15-1996 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/7/2023 2:48:16 PM
Creation date
9/7/2023 2:42:11 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
283
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
BONESTROO ASSOCIATES ® 6126361311 04/10/96 15:22 S:01/02 NO:755 <br />Bonestroo <br />Rosene <br />Andeiiik & <br />Assodates <br />An**^!* .rfM/^at* OmHJttsjtuiy <br />rtmi/fjoit Ollu C- d'Vrt*; irrv*<^ »*► • ic.ri*#'C. Ancl«»lfll Tl • M*rvm i. SnrvM.v • <br />*»* ^ • TI>oiti4H Z Hoycx. • ifnnea G S(^ull1chL TC • <br />^««ry A A/HiffKMi • tccliir'i W Pi«kw*»« 'C ind !kuMin M in«*tin.f i*A.. Isti'ut <br />/^iJOcOff ^rjor»p;»»c Hnw.i#fJ A ^unr«i«U. r*C • IC4}itrv A (>A«(iAn. PS.« 4oUirfl R. rftff«ile *?C- • <br />l» <norn W i n%trr > i. • Pjwici C Hu\%mk. Al A • M*/k A N«A«Aa •**» • <br />f f'C • *r<l K <br />(S: <br />iifftrrt Sf MM • KU-^»r^ M/i <br />Engineers & Architects <br />April 10.1996 <br />Ms. Jeanne A. Mabusth, <br />Building and Zoning Administrator <br />City of Orono <br />Post Office Box 66 <br />Crystal Bay, Minnesota 55323 <br />Forest Lake View <br />File No. 139-2130 <br />Dear Jeanne, <br />We have reviewed the prcliminafy street, utility and grading plans prepared for l^rbcrt Johnson on <br />the proposed Forest Lake View subdivision located west of WUdhurst Trail in the west half of <br />Section 7. There are several inconsistencies shown on the three plan sheets and several issues that <br />need to be addressed relative to engineering matters. <br />1. Utllltlas: Sanitary service to Lots 3 and 4 will be a problem based on the proposed bouse <br />elevations. The invert of Manhole 4 should be four feet lower to adequately serve Lot 4 if <br />the house will have a full basement, and Cleanout 4 should be one foot lower to serve Lot <br />3. The sanitary sewer should be installed at least 20 feet past the proposed curb line and <br />possibly all the way to Garden Lane. The sewer service to Lot 3 should connect to Manhole <br />4 at a different location than the sewer extension or to the sewer line with a wyc. The plans <br />should specify PVC pipe instead of VCP and VCT. The proposed sewer along Wildhurst <br />Trail from Manhole 2 to Manhole 1 will be up to 16’ feet deep in places due to the steep <br />slope. Shifting the alignment near the center of Wildhurst Trail would eliminate Manhole <br />I ftmj allow the sewer to be more shallow. Installing the sewer in this location would require <br />that Wildhurst Trail be reconstructed. <br />2. Sircatt The City and applicant should determine if this street will be public or private as <br />different standards apply for each. The street grades appear adequate. The proposed street <br />_section should be included in the final plan set. There is st^mc concern that there may be <br />erosion in the ditches along the proposed street. It may be desirable to construct Wildhu«t <br />Court to an urban section with curb. If done, the proposed catch basins and pipe should be <br />moved east to the intersection of Wildhurst Trail. Drainage can then be directed to the <br />proposed NURP pond and minimize flows out to Wildhurst Trail. <br />3, Gradings The grading plan and pond detail do not match. The pond will require up to a <br />20 foot excavation to construct In the wooded area. It may be easier to construct the pond <br />closer to the existing culverts near Wildhurst Trail. This may require easements from the <br />adjacent parcel. The grading plan should include the proposed ditch along Wildhurst Trail. <br />Erosion control measures should be sht>wn on the plans. <br />4. Drainage: Drainage and ponding calculations should be provided. The outlet structure <br />detail should include invert elevations for all pipes and show pond normal water and <br />2335 West Highway 36 ■ St. Paul, MN 55113*3898 • 612*636*4600
The URL can be used to link to this page
Your browser does not support the video tag.