MINUTES OF THE ORONO PLANNING COMMISSION <br />MEETING HELD ON MARCH 18, 1996 <br />(#6 - #2114 Clark Winslow - Continued) <br />Gustaiwn confirmed that there would be no problem with the 929.4 devation. Peterson <br />noted that this was his first recommendation for approval of pond dredgii^ in a designated <br />wetland. <br />(#7) #2115 FRANK BENNETT, 31S/40S TONKAWA ROAD - CONDITIONAL <br />USE PERMIT - PUBUC HEARING - 8:40-8:58 P.M. <br />The Certificate of Mailing and Affidavit of Publication were noted. <br />The Appficant was represented by Dale Gustafkm. <br />Mabusth reported that the pond will be located in a low area of the 7 plus acre lot and is <br />made up of types 1 and 3 wetlands. The wetland is not DNR protect^ nor on the <br />National Wetlands Inventory Map, and would not require either Corps of Engineers or <br />MCWD approval. The <mly approval necessary is that firom the City of Orono. The <br />proposed pond is at 4; 1 slope with a overflow drainage through the ravine arxl to the <br />southeast and eventually flows under Tonkawa Road. The ravine on the Gage property <br />suffers major erosion. Mabusth noted that the pond would serve as a stormwater <br />retention area. The proposal is for removal of 1900 cubic yards of fill. Gustafkm <br />suggested asking why the dredging would not be a permit issue of the Corps of Engineer. <br />He noted the Corps of Engineers have guidelines for permits in areas of under 1/2 acre <br />that qualify for nationwide permit. He noted applicant may still need permission. The <br />Commission was informed that the survey work was completed by Mark Gronberg. <br />Peterson asked if the intention of the dredging was for a wildlife pond. Gustafson said this <br />was not the intention. The imention was to gain an aesthetically pleasing look with open <br />water. The erosion of the ravine on the Gage property was noted. Gusta&on said the <br />location of the pond has spinoff benefits and would allow for diversification of habitat. <br />Gustafson said the pond would aid in creating a water retention area for ninoff, protect <br />and slow down the runoff^ and the drainage running into the ditch would be metered. It <br />was further noted that the proposal calls for the removal of the existing access off of <br />Tonkawa, and the fill would be used for the shoulder of the new drive. The driveway <br />would then link with the drive further south on Tonkawa. <br />Hawn commented that the application was not proposed as wildlife pond for permit <br />reasons, but if the applicant would want wildlife, a greater slope would be required. <br />Gusta^n said the depth must be obtained as the pond would become shallower over <br />time, and it was important to maintain the water retention. The possibility of a larger, <br />shallower pond was discussed, but it was noted that it would disturb a larger area which <br />was not desired. <br />L,—...