3. The welijnds have been delineated and are slioun on the attached pi-vn^ <br />4. Because we know the location of tlie wetlands we were able to have the Percolation Tests <br />completed. A report is attached. <br />5. There were concerns regarding the erosion associated w ith the grading of the roads. In <br />speaking with the Citv’s Engineer we have been able to solve the erosion within the graded but unfinished <br />road by building dams with large diameter rock Also, we can cut a shallow V into the rod to contain the <br />path of the water. <br />This was a difficult parcel of land to design. We do appreciate the efforts of the staff. Planning <br />Commission and consulting engineer to address the issues invoK ed. <br />We look forw ard to seeing you at the meeting of May 20, 19%. <br />Sincerely, <br />Hilloway Corporation Greenfield Corporation <br />t