My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-20-1996 Planning Packet
Orono
>
Planning Commission
>
1996
>
05-20-1996 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/7/2023 2:45:57 PM
Creation date
9/7/2023 2:41:48 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
197
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
pxm.k <br />CITY OF ORONO <br />SEPTIC SYSTEM APPROVAL <br />CITY of ORONO <br />MunkipBlOOkci <br />Poit Ofhct Boi 66 <br />CfTsUl Bay, MimiaoU 55323-0066 <br />LOCATION: 1575 Long Lake Blvd. <br />OWNER:Edna Mbee <br />_SEPTIC CONTRACTOR:GENERAL CONTRACTOR._______________ <br />SITE EVALUATOR: Soil Testing RgpQgj DATE: 2, 1996 <br />The City of Orono has Approved your on-site system design as of January 5, 1996 <br />(approved-disapproved) (date) <br />The site is limited due to steep slopes, mottled soils at 39^48" and fill <br />witli the following comments: soils at approx. 40”. Jim Anderson (U of MN) . Bob <br />Kocn (Koch's Soil Testing;, and Duanne Ritter (Ritter Exc.) believe that <br />a gravelless system will function adequately under these conditions. The <br />e 1st. No alternate site is available, but sewer may be available in the <br />THIS IS NOT A PERMIT. This is a design approval form which must accompany the site plan. A pcnnil mutf uture <br />be issued to a licensed septic contractor prior to installation. A list of currently licensed septic contractors is <br />enclosed. <br />NOTICE TO INSTALLERS: Any changes to the approved plans and specs must have prior approval of the <br />Inspector (473-7357). Call for inspections 24 hours in advance. <br />ALL DRAINFIELD AREAS MUST BE FENCED OFF prior to building site excavation and fencing must remain <br />in place until final site grading. Approval to pour footings will not be granted until the Inspections Department <br />has verified that primary and alternate sites are adequately protected. <br />NO VEHICULAR TRAFHC OF ANY KIND (cars, trucks, earth moving equipment, etc.) is allowed within 20' <br />of tested drainfleld sites either before or after system construction. Compaction of these areas could render them <br />unusable prohibiting the timely completion and or limiting the long term use of the property. <br />A site copy will be available at the City Offices for the septic contractor. <br />CITY OF ORONO <br />On-site Systems Manager <br />‘mXFHONE-473-73S7 • FAX-47MS10 <br />•»•••.* •• •««/ ... <br />*• . •
The URL can be used to link to this page
Your browser does not support the video tag.