My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-17-1997 Planning Packet
Orono
>
Planning Commission
>
1997
>
11-17-1997 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/6/2023 10:52:55 AM
Creation date
9/6/2023 10:48:41 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
207
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MINUTES OF THE ORONO PLANNING COMMISSION <br />MEETING HELD ON OCTOBER 20, 1997 <br />(#8 - #2290 Elaine and Steve Silus - Continued) <br />During public comments, Pat Spilseth, the next-door neighbor, said she receives the <br />runoff on her property. During a heavy rainstorm this summer, the water came within <br />inches of her door. She indicated that the applicant has offered no accommodations to <br />this problem which had never existed before the construction began. <br />Lindquist asked Spilseth if she has seen the present proposal. Spilseth said she has not. <br />Spilseth said the new grading has created difficulties by raising the level of the home. <br />The old house was on the same elevation level as her home. She reported that the <br />driveway was found inadequate for access immediately after construction began but the <br />work was never stopped. Spilseth said the garage should be changed from a side-loading <br />garage to a double car straight-in garage from Casco Pt. Rd., like other garages in the <br />neighborhood. <br />Van Zomeren reported that neither Gappa nor the City Engineer have reviewed the plans. <br />Schroeder said it was critical to solve the problems. He asked why the plan was just <br />submitted at the beginning of the meeting. <br />Silus said he had been out of town and only received the plans himself. He has not <br />reviewed them either. The plan includes an engineered wall instead of the previous <br />boulder wall. <br />Lindquist noted the applicant was aware of these problems a month ago yet waited until <br />now to address them. <br />Schroeder read letters into the record from Judith Boy Ian, 3195 Casco Point, and Susan <br />Smith Swanson, 3229B Casco Circle, both in opposition to the plan. <br />Van Zomeren noted Bruce Vang, City Inspector, was present to answer any questions. <br />Lindquist said the information provided would have to be reviewed. He noted the plan <br />would have to satisfy both the City Engineer and neighbors. He said the application <br />would require tabling. <br />Silus indicated that snow removal will not change. <br />Schroeder suggested the applicant change the garage and access it from the street side. <br />Silus said that would be costly. He feels the drainage problem will improve with the <br />newly submitted plan. He noted the problem will exist until construction is completed.
The URL can be used to link to this page
Your browser does not support the video tag.