Laserfiche WebLink
r <br />EnKincer at 150% of the proposed improvements. Following preliminary plat approval, Ae <br />developer may apply for a land alteration permit from the City to commence construction at the <br />grades and elevations required by the approved plans. <br />Park Dedication Fees <br />acce <br />STAFF RECOMMENDATION <br />1. A sewer connection fee of $40,955. <br />2. A water connection fee of $4,020. <br />3. <br />4. <br />5. <br />6. <br />Park dedication fee of 8% or $19,064. <br />Legal agreements, including covenants regarding Outlets A and B, <br />7. <br />8. <br />Legal agreements regarding the homeowner's association. <br />Drainage, flowage and conservation, and utility easements as recommended by the City <br />Engineer. <br />Dedication of 7' of right-of-way to Hennepin County along Shoreline Drive. <br />Review of the landscape plan and planting schedule by the City's Landscape Architect <br />consu^tafvt. <br />9. <br />10. <br />Coiitepi plan showing the future extension of Livingston Avenue to the west. <br />A drainage area nu^, storm sewer and ponding calculations shall be provided with the final <br />plat. <br />11.The pond outlet shall have a control structure to treat runoff prior to reaching the wetland. <br />The invert of the 18" inlet pipe to the pond should be set at the NWL (938.0). Pond design <br /># 2308 Brook Park Realty <br />3560 Shoreline Drive <br />PRD and Prelim. Plat <br />10/20/97 <br />page —6 <br />I