My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-15-1997 Planning Packet
Orono
>
Planning Commission
>
1997
>
09-15-1997 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/6/2023 10:10:36 AM
Creation date
9/6/2023 10:01:59 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
476
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CTTYOF <br />onoNO <br />niiKESO^^i <br />Mr. Michael P. Gaffron <br />Sr. Planning Coordinator <br />City of Orono <br />Planning Commission <br />P.O Box 66 <br />Crystal Bay, MN 55323 <br />1 5 1997 <br />September 14, 1997 <br />Dear Mr. Gaffron, <br />We are writing to whom it may concern regarding the proposed development of the <br />properties known as Lot 2, Block 1, Heathercroft and Lot 90, Tonkaview Gardens, <br />application #2294. Our residence is adjacent to said property directly across the public <br />roadway at 1186 Wildhurst Trail. <br />We are unabl. to attend the public heanng of the Planning Commission on September <br />15, 1997 However, we are intensely interested in the appropriate development and <br />land management surrounding Forest Lake Bay. We anticipate our vision of <br />development for our immediate community and rights as residential property owners <br />will be appropriately represented by the Planning Commission and City Council. <br />Specifically, we desire to comment on the following concerns regarding the proposed <br />development. <br />We understand the property is proposed for re-zoning from three acre lots to <br />one acre This is inconsistent with appropriate land use standards given the <br />grade and in-stability of the undeilying ground. This action would contribute <br />to a well known run off situation that threatens the viability of Forest Lake <br />Bay. Over the past six years we have experienced significant erosion from the <br />public roadway to the lake due to run off from Saga Hill. Additionally during <br />a significant downpour the nressuie and build-up of run-off broke through our <br />basement window leaving several inches of water in our living area. <br />How does the City propose funding the cost of expanded public roadways and <br />the extension of municipal sewer and storm sewer? Property taxes in our <br />community have increased dramatically over the past six years. The <br />affordability of housing for long standing members of our community has <br />declined unreasonably in our opinion We expect that the cost of such <br />additions be borne entirely by the developer. <br />Will the storm sewer run into the lake? This would be of great concern to the <br />maintenance of property values of a great many stakeholders including <br />ourselves.
The URL can be used to link to this page
Your browser does not support the video tag.