My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-18-1979 Planning Packet
Orono
>
Agendas, Minutes & Packets
>
Planning Commission
>
Packets
>
1990-1999
>
1997
>
08-18-1979 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/6/2023 9:27:35 AM
Creation date
9/6/2023 9:20:49 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
366
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
s <br />S-P TESTING, INC.Steven B. Schirmers • MPCA Cert.No. 627 <br />951 Katydid Lane NE • St. Michael, MN 55376 • (612) 497-3566 <br />FAX(612)-497-5011 <br />State License #394 <br />I <br />May 19, 1997 <br />Ted Wolff <br />900 Willow Drive North <br />Lot 2 <br />Orono, Henn. Co., MN jUL 2 3 <br />cnv Of ORONO <br />This on-site sewage treatment system is designed for a Type 1, five bedroom home, in <br />accordance with the Minnesota Pollution Control Agency Chapter 7080 and local <br />ordinances. <br />The soils on this site are SCS soils mapped - LTB - LeSueur loam. The seasonally <br />saturated soils were located at 12" to 26" (mottled soil). Due to the seasonally saturated <br />soils, a Pressurized Mound System will need to be installed to treat septic effluent. The <br />bottom of the treatment area must be located at least 3' above the saturated soils. <br />The soils at a depth of 12" have a percolation rate averaging 12.7 mpi. <br />A pumping chamber will need to be installed to lift the effluent to the treatment area. <br />The power supply and switches must be located outside the manhole and pumping <br />chamber In a weather proof enclosure. A warning device must be installed with a light <br />and sound device, this is In case of a pump failure. <br />The manifold and supply line pipe must have back drainage to the pumping chamber. <br />The distribution pipes shall have their ends capped. Be sure the rock and sand fill <br />material are clean. The sod layer below the entire mounded area must be turned over, <br />just break up the sod, be sure not to over work. <br />All neighboring wells are located greater than 100’ away from the proposed treatment <br />area. <br />1
The URL can be used to link to this page
Your browser does not support the video tag.