My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-16-1997 Planning Packet
Orono
>
Planning Commission
>
1997
>
06-16-1997 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/6/2023 8:47:18 AM
Creation date
9/6/2023 8:40:23 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
361
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
. % <br />CITY OF ORONO <br />SEPTIC SYSTEM APPROVAL <br />CITY of ORONO <br />Municipal OfBces <br />FtMtO(nccBox66 ' <br />CiTstal Bay, MIno«Qta 5923-006$ <br />j2245 Firsncli Iislcs Rd <br />OWNER: <br />U. S. Marshall's <br />GENERAL CONTRACTOR:- SEPTIC CONTRACTOR: Don' s Backhoe <br />SITE EVALUATOR: ® Backhoe REPORT DATE: 25, 1997 <br />The City of Orono has Approved__________your on-site system design as of 1^97 <br />(approved-disapproved) (date) <br />widi the following comments: design is approved with variances for a ten <br />foot setback from the property line and a‘97' setback from.a natural <br />environment lake (a 150' setback required),. Additional plumbing work <br />must be performed to connect all sewer'lines to the proposed system <br />THIS IS NOT A PERMIT. This is a design approval form which must accompany the site plan. A permit must <br />be issued to a licensed septic contractor prior to installation. A list of currently licensed septic contractors b <br />enclosed. <br />NOTICE TO INSTALLERS: Any changes to the approved plans and specs must have prior.approval of the <br />Inspector (473-7357). Call for inspections 24 hours in advance. <br />ALL DRAINFIELD AREAS MUST BE FENCED OFF prior to building site excavation and fencing must remain <br />in place until final site grading. Approval to pour footings will not be granted until the Inspections Department <br />has verified that primary and alternate sites are adequately protected. <br />NO VEHICULAR TRAFFIC OF ANY KIND (cars, trucks, earth moving equipment, etc.) is allowed within 20' <br />of tested drainfleld sites either before or after system construction. Compaction of these areas could render them <br />unusable prohibiting the timely completion and or limiting the long terra use of the property. <br />A site copy will be available at the City Offices for the septic contractor. <br />CITY OF ORONO <br />Stephe , On-site Systems Manager <br />TELEPHONE-473-7357 • FAX-4734)510 <br />*
The URL can be used to link to this page
Your browser does not support the video tag.