My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12-09-1996 Council Packet
Orono
>
City Council
>
1996
>
12-09-1996 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/5/2023 2:14:19 PM
Creation date
9/5/2023 2:10:56 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
387
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MINUTES OF THE REGULAR ORONO CITY COUNCIL <br />MEETING HELD ON NOVEMBER 25, 1996 <br />(#5 - #2192 Robert and Wendy Beutler - Continued) <br />Mr. Beutler said it was not their intent to use the st ucture as living space for others but <br />only for additional space for workshop He noted the building is in excellent shape and <br />there is no problem with hardcover on the properly Beutler said he and his neighbors <br />feel it would be a shame to remove such a building. Beutler said the 120 ’ separation from <br />house and accessory structure was a reason to request the bathroom facility remain. He <br />indicated the sewer line could be iiooked up to for the new house as well as old. He <br />volunteered to place limitations on the property on the abstract itself noting the restrictive <br />covenant w ould run with the property on the chain of title <br />Goetten was informed the proposed size of the new residence is 1200 s.f <br />Jabbour explained to the applicant how Orono is seen as a bedroom community and only <br />allows guest houses if there is adequate room for future subdivision and an additional <br />sewer access charge is paid It is his opinion that this application is in direct conflict with <br />the objectives of the City He noted concern with w hat could happen in the future and <br />sees a solution with the removal of plumbing arid heating Jabbour indicated that <br />approval of the accessory structure usage with plumbing and heating would have a <br />domino effect on a policy beyond this proposal. <br />Huit was informed the current garage would be utilized by the new residence also. <br />There were no public comments. <br />Hurr noted that the cost of enforcement would be born by the applicant. Mabuslh <br />indicated the current resolution does not stipulate that but could be amended. Callahan <br />informed that this would not protect the City. <br />Kelley moved, Jabbour seconded, to approve Resolution #3806 for the lot width variance <br />only. Vote. Ayes 5, Nays 0. <br />Hurr asked for an explanation on previous applications. She inquired if a CUP for a <br />guest house could be obtained Nlabusth noted the lack of appropriate acreage as found <br />in the other applications. She said she would like to see standards developed Hurr said <br />she would be in support of the proposal if the plumbing was removed. Mabusth did note <br />the applicants intend to live in the structure while the new residence is being built. <br />Kelley indicated if the lot was vacant and a new structure was built and the applicant <br />desired an accessory structure, he could do so. He informed the applicant if the heating <br />and plumbing were removed, the structure could remain without requiring the City's <br />approval <br />Jabbour asked the applicant to work with Staff'on what makes a structure an accessory <br />stmeture.
The URL can be used to link to this page
Your browser does not support the video tag.