My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12-09-1996 Council Packet
Orono
>
City Council
>
1996
>
12-09-1996 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/5/2023 2:14:19 PM
Creation date
9/5/2023 2:10:56 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
387
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
^ - <br />ORONOCn Y COUNCII> MEEI ING <br />MINUTES FOR NOVEMBER 25, 19% <br />ROLL <br />The Council met on the above mentioned date wth the following members prRt^: <br />Mayor Edward J Callahan, Jr, Council Members J Diann Goetten, Gabriel JabbonfTc/j^ <br />Charles Kelley, and JoEllen Hurr. Representing Staff were Cit> Administrator Ron <br />Moorse, City Attorney Tom Radio, City Engineer Glenn Cook, Public Works Director <br />John Gerhardson, Building and Zoning Administrator Jeanne Mabusth, Assistant Planning <br />and Zoning Administrator Michael Gaffron, and Recorder Sherry Frost Mayor Callahan <br />called the meeting to order at 7 00 p m <br />(#1) PUBLIC INFORMATION MEETING - BRACKETTS POINT CURVE <br />(COUNTT' ROAD 15) ROADWA> IMPROVEMENT <br />Bruce Polaczy k, Hennepin County Engineer, along with two members of the design <br />team, were present <br />Polaczyk reported that Indian bunal mounds have been found in the area which was <br />previously approved for the layout for the CoRd 15 improvements Jim Jones of Indian <br />Affairs has confirmed the mound locations As a result, the road design has been shifted <br />to the east in order to thread the road through the mounds This new layout has a major <br />impact on the homes to the east resulting in the need to build 10' high retaining walls. <br />Polaczyk said the right-of-way department has estimated the cost for the road relocation <br />at $150,000 The construction cost total is estimated at $240,000 The majority of the <br />costs involved for Orono is for right-of-way at 50% of the total for an amount estimated <br />at $75,000-$80.000 Polaczyk said Indian Affairs has highly recommended avoiding the <br />area around the Indian mounds The County is now of the opinion that the County and <br />City would not gain the value necessary to warrant the curve of the road through the <br />mounds. <br />Callahan polled the audience. It was found that approximaiely 12 people were in <br />attendance regarding this issue. Of that number, no one w as in favor of this curve <br />reconstruction. <br />Jabbour indicated he informed an Indian commission member that the City is sensitive to <br />the issue of Indian Mounds and would go beyond the limit of the law to protect them. <br />Jabbour said the City should not construct the roadway in the area of the mounds. <br />Hurr said she is concerned with safety and the lack of shoulder of the current roadway <br />and would have liked to have seen the curve straightened out Polaczyk said the project <br />would have granted the opportunity to open up the sight lines and accommodate the need <br />to pull oft'onto the shoulder. Polaczyk said the County feels the curve would have to be <br />flattened and configuration changed, but this would aft'ect the Indian mounds, and the <br />County is also sensitive to this issue. Hurr cited another example of disturbing of Indian <br />mounds in the past at Green Tree
The URL can be used to link to this page
Your browser does not support the video tag.