Laserfiche WebLink
CONSTRUCTION PERMITS AND INSPECTION FEESPennit TvpcON-SITE SYSTEMS <br />Design Review Fees <br />Subdivision Site Evaluation Report Review <br />Residential System Permit: <br />Repair existing system <br />New/Replacement System <br />Non-Residential System Permit: <br />New or Total replacement <br />Partial replacement <br />Annual Service Charge <br />ApplicableFee Code Section(Ord. 210) <br />Included with pennit fees <br />$ 50.00/per new lot <br />$50.00 <br />$100.00 + $20.00 per each inspection over 3 <br />(Includes outhouse on Big bland) <br />$100.00 + $20.00 per each <br />inspection over 4 <br />$ 60.00 + $20.00 per each <br />inspection over 2 <br />$ 50.00/systan/yoir plus <br />an additional $10.00 fee for <br />late penalty plus 8% <br />interest for unpaid charges <br />certified <br />SecUon 12.30, Subd 8(C) <br />GRADING, EXCAVATION, FILLING <br />-101 + cubic yards <br />- 1-100 cubic yard ( max. 10 loads) <br />$ 50.00 (staff permit) + engineering fees if required <br />($100.00 if engineering fee necessary) <br />$ 75.00 + Conditional Use Permit + <br />$25.00 per oich inspection <br />over 1st <br />NOTE: 101 cubic yards or more requires a Conditional Use Pennit unless approved as part of building pennit. <br />SIGNS <br />Temporary <br />Permanent <br />$35.00 <br />(Per 1994 UBC/SBC Standard Schedule)