Laserfiche WebLink
2. <br />b. <br />c. <br />d. <br />e. <br />Grading and surfacing plan - dated March 22. 1996. <br />Planting plan - dated March 21, 1996, most revised date <br />Floor plan - dated March 22, 1996, most revised date <br />Exterior elevations - dated March 22, 1996, most revised date <br />f. Site plan > dated March 22, 19%, most revised date <br />Upon application for a building permit, applicant must provide the following <br />information: <br />a.All plans as noted above must be signed by either the licensed architect or <br />licensed engineer. <br />b. Final specs and plans for extension of the utilises for the City Engineer's <br />review. <br />c.Written report from applicant's architect confuming number of SAC tmlts <br />required by Me* Council. <br />d. Final grading and paving plans to reflect Orono Engineer's <br />recommendations and corrections. <br />3. <br />4. <br />e. Payment of required SAC units. Payment of sewer aiKl water connection <br />fee at $8490.00 per unit to the City. Total payment to be based on number <br />of SAC units charged by Met Council. <br />Applicant and owner to grant drainage easement over detention pond on property <br />(see sample enclosed). <br />Applicant to obtain an •access permit for the ne v curb cut at Old Crystal Bay Road <br />North from the Orono Public Works Department. <br />Page 5 of 9