My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-28-1996 Council Packet
Orono
>
City Council
>
1996
>
10-28-1996 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/5/2023 1:30:43 PM
Creation date
9/5/2023 1:26:08 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
505
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
L <br />Request for Council Action continued <br />Page 4 <br />October 23, 1996 <br />#2128 Orono Ice Arena, Inc., 1025 Old Cr\'stal Bay Road North <br />Tl-22 Applicant ’s Addendum Comments Concerning Neighborhood Concerns and <br />Applicant ’s Response <br />U Planning Commission Minutes 4/15/96 <br />VI-5 Gaffron Report, April 17, 1996, Determination of EAW/EIS Applicability-Orono <br />Ice Arena Project <br />W Legal Combination of Property with Orono High School Property <br />XI-3 MCWT) Permit Application No. 96-80 and MCWD Letter of April 23, 1996 <br />Y Draft of Memorandum of Understanding Between City and Applicant Regarding <br />Maintenance of Stormwater Facilities <br />Articles of Incorporation-Orono Ice Arena, Inc. <br />IRS Letter, 501 (c) (3) Status <br />Building Signage Plan <br />Roof Plan Locating Peak Height at Comers and Midwest Side Wall <br />DDl-29 Ground Lcase/Recreational Facility Cooperative Agreement <br />EE Certification of Funds and Final Cost Estimate <br />FF Revised Site Plan <br />Z <br />AA <br />BB <br />CC <br />Building and Site Plan <br />The enclosed arena structure is proposed at 163' x 251' for a total footprint of 40,900 s.f. The <br />structure will meet the required 50' setback from all lot lines. Per the building height definition <br />of the zoning code, the legal height of the structure is 20’ 6" defined at the west side of the <br />structure. Refer to Exhibit CC, the final design and grading information confirms peak heights <br />of structure on roof plan. At the north and south comers along the west lot line, the peak <br />height is approximately 23-24’. The peak height increases as you move eastward where the <br />peak height at both north and south comers is recorded at 32’. The peak height of the east <br />wall along Old Cr>stal Bay Road is 32’. <br />In an attempt to minimize the starkness of the structure, applicant has introduced translucent <br />panels to be installed within sections of pre-cast concrete wall to soften impact. The <br />translucent panels resemble windows. <br />The entire stmcture will be constmcted of pre-cast concrete wall panels. The f.nin'jj uon will <br />be slab on grade. The 800 seat capacity bleachers will also be constructed of a pre-cast <br />concrete. The stmcture will be fully sprinkled. The original arena stmcture proposed by <br />applicant had a curved roof design that reached a maximum height of approximately 40-41'. <br />The stmcture is now' shown with a flat roof with a maximum peak height at 32'. <br />1 <br />i
The URL can be used to link to this page
Your browser does not support the video tag.