My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-23-1996 Council Packet
Orono
>
City Council
>
1996
>
09-23-1996 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/5/2023 12:58:10 PM
Creation date
9/5/2023 12:54:49 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
390
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1 <br />Zoning File #2135 <br />May 7, 1996 <br />Page 5 <br />Foundation <br />The Inspections Department has inspected the existing basement and finds that it is 8" block. <br />This will require an engineered design to support the additional story, but will not require <br />replacement of the existing foundation. <br />Summary of Issues for Consideration <br />1.Addition of structure less than 100’ from lake. <br />2. Attached garage only 1' from street lot line, 18 ’ from side lot line; house only <br />30’ from street lot line. <br />3. Proposed hardcover increases in 0-75’ and 75-250’ zones. <br />4. Average setback encroachment. <br />5. Structure and land alterations in bluff impact zone. <br />6. Septic system limitations/future municipal sewer. <br />Staff Recommendation <br />Any recommendation for approval, partial approval or conditional approval should clearly define <br />the hardships and justification for each of the variances. Planning Commission should consider <br />whether the proposal can be revised to eliminate the side setback variance, increase the street <br />setback to a minimum of 10’, eliminate any hardcover increases in the 0-75' zone, and limit <br />total hardcover to a level equivalent to 25% of the 75-250' zone (2,724 s.f.). Finally, Planning <br />Commission may wish to delay approval of the expansion from two to three bedrooms, until <br />a final decision to construct city .sewer is reached. <br />Options for Action <br />1. <br />2. <br />3. <br />4. <br />5. <br />Recommend approval as proposed. <br />Recommend approval with specific revisions/conditions. <br />Table for revisions/further information. <br />Recommend denial. <br />Other.
The URL can be used to link to this page
Your browser does not support the video tag.