My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-23-1996 Council Packet
Orono
>
City Council
>
1996
>
09-23-1996 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/5/2023 12:58:10 PM
Creation date
9/5/2023 12:54:49 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
390
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1/1 Bonestroo <br />Rosene <br />■ Anderlik 6i <br />|\ I Associates <br />Engineers & Architects <br />September 5, 1996 <br />ir<;•f 4'r»fT» Atfrrt (.lTi£»>Kru^vr^ <br />**» •' • Ot* . G n • jr>, j>*' C *'* • M»fvn L So*^v.«tdi ^E • <br />Tiifi* " Pf •C’tn*'*r r ■'M ^ • Tho,n.»» E \.*vet rt • PoheM G Schu*'»fCht P£ • <br />« BoufC??^” PE • 9iA'fi 4r Wovmf »-< •rti \u* V Eoc*’*'' CPA Con>uit.^nt\ <br />«r!* Pr* Hov. »rrr ^ PE •n -r** a i-rr-cn **E • f?ohc'T P Pfef^e'V PE • <br />Pir^»4r(j \n' fovt**' PC • r j o i .fco* • rr • 'vop'f c Pu .:*?ii a i a • m a Hw-^son pe • <br />Vt,—nr) T P *•.! • **\v • T ! H ,"•« uT 't • . <•• th ” Ar. ?t • Vam f! Poifs P£ • <br />^ijrtv ** Vl'M» --icp •*€ t S • ^•. : • •''5:srti-rn <br />O * ■ St P »al P*’!*^* 'tf^ \1 ‘ U ’«» .n*d St VN • Vr iuO'^ <br />S.^•m <br />♦ # <br />Mr. John Gerhardson <br />City of Orono <br />P.O. Box 66 <br />Crystal Bay, MN 55323-0066 <br />Re: Old Crystal Bay Road Trail <br />Our File No. 13985 <br />Dear John: <br />The bids received on the Old Cry’stal Bay Road Trail project include several options for contract <br />award. The options provide flexibility in determining what construction w'ork should be completed <br />in 1996. <br />Part one includes trail construction south of the railroad bridge ($85,662.50). Part two includes trail <br />construction from Kelley Parkway to the railroad bridge ($78,473.50). Alternate 1 changes the <br />completion date from this fall to next spring (-$1,000.00). Alternate 2 provides for a berm on the <br />Brunning property ($9,900.00) <br />The following is a summary of the contract award options. <br />Part 1 <br />Part 1 + Part 2 <br />Part 1 + Part 2 + Alternate 1 <br />Part 1 + Part 2 + Alternate 1 + Alternate 2 <br />Part 1 + Part 2 + Alternate 2 <br />Part 1 + Alternate 2 <br />Part 2 <br />$85,662.50 <br />164.136.00 <br />163.136.00 <br />173.036.00 <br />174.036.00 <br />95.562.50 <br />78.473.50 <br />We have also reviewed the cost to extend the trail from Kelley Parkway north through the school day <br />care center. The estimated cost to complete this w’ork is $49,000 based on the bids received. This <br />trail segment would be constructed away from the street so no street costs are anticipated. The street <br />construction cost for Part 1 is $24,000. The street construction cost for Part 2 is $25,500. <br />2335 West Highway 36 ■ St. Paul, MN 55113-3898 ■ 612-636-4600
The URL can be used to link to this page
Your browser does not support the video tag.