My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-23-1996 Council Packet
Orono
>
City Council
>
1996
>
09-23-1996 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/5/2023 12:58:10 PM
Creation date
9/5/2023 12:54:49 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
390
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MINUTES OF THE ORONO PLANNING COMMISSION <br />MEETING HELD ON NOV'EMBER 20, 1995 <br />(#11- #2086 Robert and Janice Callan - Continued) <br />Peterson moved. Smith seconded, to deny approval for application #2086 as it was his <br />opinion to deny all wetland applications Smith said she saw no compelmg benefit to <br />taking this step and saw the true advantage in keeping the wetland as it now exists. Berg <br />a<Teed. Vote: Aves 3, Peterson, Smith, Berg, Nays 2, Hawn, Lindquist. Motion passed <br />for denial. <br />Smith said she saw the drainage benefits as comparing apples to oranges. <br />Berg said she saw the application as being for aesthetical rather than environmental <br />reasons <br />Geor«e Stickney commented that the Planning Commission has approved a skating pond <br />elsewhere and here. Peterson responded that this area is a designated wetland Mabusth <br />said the pond Stickney was referring to was a type 1 wetland. <br />(#12) #2087 MINNEGASCO, 530 OLD CRYSTAL BAY ROAD - RENEWAL <br />CONDITIONAL USE PERMIT - PUBLIC HEARING - 11:00-11:07 P.M. <br />The Certificate of Mailing and * Tidavit of Publication were noted. <br />The Applicants .vere present. Reoresenting Minnegasco were Rick Pilon and Jerry <br />Kallstrom. <br />Peterson asked the applicants why a permanent fix could not occur. Pilon said Hennepin <br />County postponed the CoRd 6 project and asked the gas company to do the same. It is <br />possible that a permanent solution couid be scheduled for next year but has asked for <br />renewal of 5 year permit instead of asking for a 2-year extension. <br />Pilon said the existing feeder is west of Tow nline Road, and the low pressure system is <br />east of Townline. The purpose to to bring gas from the high to the low area to stabilize <br />and present an independent leg. <br />Lindquist asked if this would eliminate the need for the facility. Pilon said it would and <br />needed one year to verily that. <br />Pilon said the CoRd 84 project was postponed. It fed Painters Creek with a high pressure <br />feed toward Rockford. Pilon said gas cannot be taken out of this feeder to enforce the <br />area He said the project is an insurance plan to ensure gas outages do not occur. <br />Smith asked how often this vaporizer is used. Pilon said it was used j times in 1992- <br />1993, 4 t^mes in 1993-1994, and 3 times in 1994-1995 with 3 standbys. Smith asked if <br />there has been any complaints or concerns. Mabusth said there has been none. <br />25
The URL can be used to link to this page
Your browser does not support the video tag.