My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-23-1996 Council Packet
Orono
>
City Council
>
1996
>
09-23-1996 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/5/2023 12:58:10 PM
Creation date
9/5/2023 12:54:49 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
390
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REQUEST FOR COUNCIL ACTION <br />DATE: September 19, 1996 <br />23 1995 <br />ITEM NO.: <br />Administrator Reviewed:Agenda Section: <br />Zoning <br />Department Approval: <br />Name Michael P. Gaffron <br />Title Assistant Planning &. Zoning Administrator___________ <br />Item Description: #2159 James and Joann Jundt, 1400 Bracketts Point Road - Variances - <br />_____________Resolution____________________________________ <br />Zoning District: LR-IA, Single Family Lakeshore Residential, 2 Acres, Unsewcred <br />Application: Request for lakeshore setback variance and 0-75' hardcover variances for <br />restoration of existing grotto, retaining wall and lakeshore stairway system <br />(applicant also proposes cosmetic repair to existing boathouse). <br />List of Exhibits <br />A - Resolution <br />B - Notice of Planning Commission Action 9/19/96 <br />C - Memo and Exhibits of August 14, 1996 <br />Applicants propose to restore two existing limestone rock stairway: ding down the lakeshore <br />bank east of the e.xisting house. These stairways have been in . .ce for many years, and <br />restoration will include repair or replacement of d“tf-inrated stonework and handrails. <br />Additionally, applicants propose to restore the > lerground grotto and its associated retaining <br />wall. This is an underground cellar-type room, located within the lakeshore bank behind a <br />stone retaining wall. Restoration will include mainly cosmetic work including adding stucco <br />interior wall and ceiling panels, adding a decorative light fixture, restoration of the existing <br />wood doors, and restoration of the existing stone retaining wall. <br />Applicants had originally proposed significant restoration of the existing boathouse, which is <br />in failing condition. That work was to include roof replacement, window and door replacement <br />and modification, straightening of the frame, residing, a new concrete floor, and a new concrete <br />step. The August 14 staff memo indicated that the apparent total restoration proposed suggests <br />that the structural work intended likely exceeds 50% of the value of the structure at the time <br />it became non-conforming. The zoning code limits the structural restoration of such structures <br />with the goal that they eventually disappear. Prior to the Planning Commission review, <br />applicajits withdrew the boathouse work from this application. However, at the Planning <br />Commission meetin applicant indicated that rather than remove the structure they intend to <br />repair the roof. Please review the di-^cussion on Page 2 of the .August 14 memo regarding the <br />confermity of this structure.
The URL can be used to link to this page
Your browser does not support the video tag.