My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-23-1996 Council Packet
Orono
>
City Council
>
1996
>
09-23-1996 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/5/2023 12:58:10 PM
Creation date
9/5/2023 12:54:49 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
390
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
KOCH’S SOIL TESTING <br />P.O.BOX 81 <br />LORETTO.MN 55357 <br />TEL: (612) 479-2637 <br />Edna Albcc Estate <br />1/2/96 <br />Job Site: 1575 Long Lake Blvd., Orono, Mn. <br />Percolation tests and soil borr.gs were done on the above lot on 11/7/95 <br />what type of drainfield could be installed to replace the current system which <br />m :*eJ^lion rate was 19.9 min./in. and the depth to mottled soil was at 39-48 <br />the enclosed soil borings and percolation tests for the details. Note: the perc. test <br />“many a preTurized sy^t^wlTs^igned for this properly due to the mottled soil level <br />I tiTS'inv^^^^ on 12/27/95 with Mr. Jim Anderson (University of <br />M^e^oTMike Gaffmn and Steve Weekman (City of Orono). Duane ^ner (Duane <br />w “r ExcLting, Rockford. Mn.) and Robert Koch (Koch Soil Testing. Lorettm 1^.) <br />mesenl ^was the general consensus that a 10 inch gravelless trench system could be <br />instafed Three soil borings were taken that day (12/27/95) and mottled «* <br />42 inches to 48 inches. It was agreed that the gravelless trench system would be <br />^?delTf r ^avdle'ss on the downhill side should be at least 6 inches into existing <br />soil The soil located in between the trenches should be scarified up with e ° ‘ <br />backlS similar topsoil (black loam) be added into this area to ensure » <br />cova-TepTof 6 inches over entire drainfield area. The decision on when the placemen <br />of topsoU will be done will be up to the contractor/installcr as proper drainage areas wil <br />~ t-. srS- <br />gal /day water usage with a perc. rate of 19.9 minimch would be of the following <br />Overall size* 750 sq. ft. Total amount of pipe needed: 250 “• xhpp^fnre <br />However, it was felt that only 80% of the pipe would >>e filled with effluent. T <br />the system should be increased by 20% or to a size of 900 sq. ft. <br />Overall drainfield size: 900 sq. ft. <br />r... .-■> «> ■>-. <br />every 2-3 years. This practice will enhance the life of the system. <br />MPCA Certified <br />Roben Koch
The URL can be used to link to this page
Your browser does not support the video tag.