My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-12-1996 Council Packet
Orono
>
City Council
>
1996
>
08-12-1996 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/5/2023 11:53:52 AM
Creation date
9/5/2023 11:51:57 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
224
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ORONO PLANNING COMMISSION MEETING <br />MINUTES FOR JULY 15, 1996 <br />ROLL <br />The Orono Planning Commission met on the above date wth the followng members <br />present Chair Stephen Peterson, Charles Schroeder, Sandra Smith, Dale Lindquist, Janice <br />Berg, and William Stoddard Elizabeth Hawn was absent The following represented the <br />City Staff Building and Zoning Administrator Jeanne Mabusth, Assistant Planning and <br />Zoning Administrator Michael Gaffron, and Recorder Sherry Frost Council Members <br />Kelley and Goetten were present Chair Peterson called the meeting to order at 7 03 p m <br />SCHEDULED PUBLIC HEARINGS/PUBLIC INFORMATION REVIEWS <br />(#1) 7:00 P.M. - «I52 HANS T. HAGEN, 4750 WEST BR,\NCH ROAD - <br />PRELIMINARY SUBDIVISION <br />Application has been withdrawn by applicant. <br />ACTION ITEMS <br />(«) #2131 LARRY KARKELA, 4149 UIGHWOOD ROAD - AFTER-THE-FACT <br />VARIANCES - PUBLIC HEARING 7.03-7:18 P.M. <br />The Affidavit of Publication and Certificate of Mailing were noted. <br />The applicant was present. <br />Mabusth reported that the application was for an after-the-fact variance in the <br />construction of a 65 5 s.f upper level deck at the lakeshore side of the property. The deck <br />extends from expanding a 3' walking deck. The proposed structure is 21' in front of the <br />average lakeshore setback line. The existing lower level deck is 31.6'. This additional <br />deck results in 11.5 s.f of additional hardcover. <br />The applicant offered his apology for the after-the-fact construction. <br />Peterson informed the applicant that the issue of average lakeshore setback was important. <br />He noted letters received from neighbors on both sides in support of the project. <br />Lindquist commented on the question of whether the deck w ould have been approved if a <br />variance request was proposed prior to the construction. It was noted that the deck was <br />stopped during construction and has stood incomplete since 1993.
The URL can be used to link to this page
Your browser does not support the video tag.