My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-12-1996 Council Packet
Orono
>
City Council
>
1996
>
08-12-1996 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/5/2023 11:53:52 AM
Creation date
9/5/2023 11:51:57 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
224
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
No. Itcn <br />1 8" PVC. (y-S ’ deep in place <br />2 8" P.E., 8’-10 ’ deep in place <br />3 8"P.E.. Iff 12* deep in place <br />4 8" P.E. 12*-14’ deep in place <br />5 SuL MH 8* deep. 4’ dia.. w/l642B cstg. <br />6 Manhole Depth greater than 8* deep <br />7 Connect to existing 8" VCP <br />8 Remove A dispose of existing sanitary <br />sewer MH <br />9 Light weight aggregate or woodchip <br />Contract Unit Qvantity Amount <br />Unit Quantity Price to Date UiDate <br />LF 373 26.50 373 9.884.50 <br />LF 105 32.00 48 1.536.00 <br />LF 30 32.00 0 <br />LF 40 32.00 0 <br />EA 2 1.100.00 2 2.200.00 <br />LF 4.9 75.00 0.50 37.50 <br />EA 3 150.00 3 450.00 <br />0.00 <br />EA 2 150.00 1 150.00 <br />bedding LF 150 20.00 189 <br />10 8" X 4" PVC service wye branch EA 6 300.00 2 <br />11 4" PVC service pipe in place LF 160 15.00 37 <br />12 4" PVC riser pipe for service LF 20 25.00 10 <br />13 Connect to existing 4" service line EA 6 150.00 2 <br />14 Improved pipe fnd. per 6" increment depth LF 500 1.50 350 <br />15 Mechanical trench compaction LF 708 1.00 458 <br />16 Erosion control fence LF 800 1.50 0 <br />17 Seeding with topsoil, mulch A fertilizer AC 0.25 1.200.00 0 <br />18 Sod with topsoil SY 2.000 2.25 0 <br />19 Remove and dispose of existing bituminous SY 750 2.25 750 <br />20 Sanitary sewer television inspection LF 548 1.00 0 <br />21 Removal and disposal of unsuiuble material CY 500 4.00 0 <br />22 Clearing and grubbing LS 1 1.500.00 1 <br />0.00 <br />3,780.00 <br />600.00 <br />555.00 <br />250.00 <br />300.00 <br />525.00 <br />458.00 <br />1.687.50 <br />1.500.00 <br />V <br />Total Work Completed to Date $23^13.50 <br />l:\139\13982VnEQUEST.WB2
The URL can be used to link to this page
Your browser does not support the video tag.