Laserfiche WebLink
CONCLUSIONS, ORDER AND CONDITIONS <br />Based upon one or more of the above findings, the Orono City Council hereby <br />grants after-the-fact variances to Municipal Zoning Code Sections 10.22, Subdivision 2 and <br />10.56, Subdivision 16 (L) to allow the construction of a deck constituting 165 s.f. of additional <br />hardcover in the 75-256* zone, resulting in an excess of hardcover above the 25% hardcover <br />limit normally allov-j, subject to the following conditions: <br />1. <br />2. <br />Hardcover in the 75-250’ lakeshore setback zone shall be limited to 4,832 s.f. <br />(41.7%) per the site plan and ^anacover calculations attached to this resolution <br />as Exhibit A. All hardcover rcc ?ls required per Exhib.i A shall be completed <br />before applicant is issued a Nt^dir^ permit. <br />Hardcover in the 0-75* lakesuoa -lO iack zone shall be limited to the existing 180 <br />s.f. portion of the house and 90 - of lakeshore stairway/platfomi structure, for <br />a total of 280 s.f or 4.3% of the 0-75’ zone. This result shall be accomplished <br />by applicants reducing the 6' x 13' platform portion of the lakeshore stairway to <br />a width of 4'. <br />4. <br />5. <br />The property owner is advised that any future proposal to increase or intensify <br />hardcover on the property will require a new variance application and is unlikely <br />to be approved based on the findings of the Council noted in this resolution. <br />Applicant shall pay the $220.00 after-the-fact variance application fee, and shall <br />obtain an after-the-fact building permit for construction of the deck abutting the <br />house, and shall obtain an after-the-fact building permit for the construction of <br />the lakeshore stairway. Further, applicants shall make any revisions to said <br />structures deemed necessar>' by the Building Inspections Department to bring <br />said structures into confomiity with the Building Code requirements. <br />Authorities granted by this variance run with the property not with the <br />applicants, but are permissive only and must be exercised by application for a <br />building permit within one year of the date of Council approval, or this variance <br />will expire on that date (July 22, 1997). <br />Page 4 of 6