My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-22-1996 Council Packet
Orono
>
City Council
>
1996
>
07-22-1996 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/5/2023 11:39:47 AM
Creation date
9/5/2023 11:38:22 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
162
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
BONESTROO ASSOCIATES ^ 6126361311 07/18/96 16:49 9 :06 W0:145 <br />Task 6 - Develop Wetlands Protection Element <br />1 <br />j <br />a. <br />b. <br />c. <br />d. <br />Obtaio and plot National Wetland Inventory, SCS Hydric Soils, and Mn/DNR <br />Protected Waters maps at half-section scale. Following preparation of composite <br />maps by City Staff, digiti2e these into AutoCAD files. Plot these at half-section <br />and full-city size. <br />Assist City Staff in the classification of waterbodies and wetlands by desirable use <br />Make recommendations for additional field investigation of wetlands and <br />subsequent adjustment of classifications and assist City in establishing a strategy <br />for City Staff to inspect remaining wetlands <br />Prepare wetlands map and waterbodies classification <br />Task 7 - Hydrologic and Hydraulic Modeling <br />a. <br />b. <br />c. <br />Perform hydrologic modeling to develop storm hydrographs <br />1) ImpeAiou.^ areas <br />2) Ultimate land use <br />3) Soil types, tnfil .ation capacitic.s, antecedent moisture conditions <br />4) Precipitation intensity, duration and frequency curves for five-year and 100- <br />ycar storms <br />Perform hydraulic modeling to confirm runoff conveyance and detention facilities <br />1) Subdistricts through system to district outlet <br />2) District through system to watershed outlets <br />3) Compute runoff volumes for routing and ponding <br />Summarize design data in electronic spreadsheet form <br />1) Pond storage volume, high water levels and outflows <br />2) Pipe capacities and sizes <br />3) Channel sizes and locations <br />Task 8 - Develop Water Quality Element <br />a. <br />b. <br />c. <br />d. <br />e. <br />Review existing data on local water quality <br />Perform watci quality uiodcliug <br />Analyze results of modeling and review with City <br />Recommend surface water treatnicnt <br />Recommend monitoring program <br />tl06lVOn>•o
The URL can be used to link to this page
Your browser does not support the video tag.