My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-08-1996 Council Packet
Orono
>
City Council
>
1996
>
07-08-1996 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/5/2023 11:26:43 AM
Creation date
9/5/2023 11:23:09 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
425
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MINUTES OF THE REGULAR ORONO Cm' COUNCIL <br />MEETING HELD ON JUNE 24, 1996 <br />(Mayor/Council Report - Continued) <br />Moorse was asked how the closure of Old Beach Road between CoRds 19 and 15 has <br />w orked out Moorse said the results have been good. Hurt said residents still speak of a <br />left turn lane proposal at County 15 and Old Beach Road Callahan said the location of <br />such a turn lane was in the jurisdiction of Minnetonka Beach <br />It was suggested »hat the City residents be updated regarding the City's eftbrts <br />concerning the Highway 12 corridor selection process. <br />Callahan said the position of the City regarding the Highway 12 corridor is simple and <br />has been unchanging, w ith preference for an upgrade of the road as it exists and <br />prevention of the highw ay going elsewhere <br />Goetten said she was concerned that some people w ere not aware of the issues involved. <br />Council agreed that the citizens should be aware of the political support by the Council <br />and their monitoring of the situation Moorse said he informs those w ho inquire that <br />Mn/DOT is leaning towards an alternate 6 solution w ith potential consideration of a <br />southern bypass alternative <br />Jabbour said the last discussions included a southern bypass route, w hich would trigger <br />an EIS Moorse agreed that was his understanding of Mn/E>OT's inclination. Jabbour <br />noted that prior to the school meeting on the issue, this position was not the inclination of <br />Mn/DOT. <br />Callahan asked Staff to consider the need. Joint use and cost of hiring a fire marshal. <br />ENGINEER REPORT <br />Cook reported that the sewer metering has been completed but the flow information has <br />not yet been received The contractor has not released the information to Long Lake. <br />Long Lake will inform the City of the raw data when it is received. <br />Cook said the Kelly Avenue project is progressing. The sewer repair work should be <br />completed in about two weeks <br />cm' ADMINISTRATOR’S REPORT <br />(#11) RECODinCATION CONTRACT <br />Hurr moved, Goetten seconded, to approve the contract with Municipal Code <br />Corporation for recodification of the City's ordinances at a cost of $13,500 and to <br />authorize the Mayor to sign the contract. Vote Ayes 4, Nays 0.
The URL can be used to link to this page
Your browser does not support the video tag.