Laserfiche WebLink
Exhibit E-1 <br />1992 <br />Stubbs Bay <br />Sewer Totals <br />Construction 1995 1994 <br />$176,584 $495,361 $ 939,791 <br />8,846 52,157 43,449 <br />-2,552 1,399 <br />-74,881 48,572 <br />-135,000 — <br />—202,750 — <br />S 185,430 $962,701 S 1,033.211 <br />$$358,942 $ 240,489 <br />—135,000 10,043 <br />—77,433 49.953 <br />571,375 300.485 <br />325,000 320,969 <br />—122,830 187,837 <br />185.430 (56,504)223,920 <br />—185,430 391,326 732,726 <br />$185,430 $962,701 $ 1,033,211 <br />-74