My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-13-1996 Council Packet
Orono
>
City Council
>
1996
>
05-13-1996 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/5/2023 10:12:05 AM
Creation date
9/5/2023 10:07:05 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
292
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
DRAFT <br />COMMENTS REGARDING THE HIGHW AY 12 DECISION <br />interchanges and the Watertown Road extension are eliminated from the design. Information <br />provided to date indicates that the environmental impacts are not of a nature to require an EIS <br />for these options. However, should an alternative be pursued on the South Corridor (Luce <br />Line), the City of Orono would request that an EIS be prepared due to the extent of construction <br />on a new alignment and to the potential for very significant social, economic and environmental <br />impacts. We believe that use of an EA could expedite the environmental review process. <br />However, as you know, preparation of an EA does not guarantee that an EIS will not be <br />required. If it is likely that the issues will be significant, as we believe they would be along the <br />South Corridor, preparing an EA would not result in an expedited environmental review process. <br />We urge Mn/DOT to select the environmental review track which will adequately address social, <br />economic and environmental issues while providing for the earliest possible decision on a course <br />of action for the Til 12 corridor. Our residents ".nd businesses, as well as those in the other <br />corridor communities, have suffered enough delays and uncertainties in this process and deserve <br />a thoughtful but efficient decision-making process. <br />Responsibility of MnDOt for Mitigating Impacts <br />Specific Items MnDOT Needs to Review in the Environmental Revi<^-w
The URL can be used to link to this page
Your browser does not support the video tag.