Laserfiche WebLink
wi.-TH 12 CAPACITY IMPROVEMENT ALTERNATIVES <br />THREE-COMPONENT TSM PROPOSAL <br />cmr OF LONG LAKE, MmNESOTA <br />I. <br />Tabl« of Contents <br />Introduction <br />VIII. Conclusion <br />List of Exhibits <br />Figure 1 <br />Figure 2 <br />Figure 3 <br />Table 1 <br />Table 2 <br />Table 3 <br />4 <br />II. Project History <br />III. City of Long Lake Characteristics <br />IV. Mn/DOT Process <br />V. City of Long Lake Issues <br />VI. Description of TH 12 Three-Component TSM Proposal 9 <br />VII. Justification for Consideration of the <br />Three-Component TSM Proposal <br />TH 12 Corridor Study Project Area <br />Alternatives Selected for EIS Analysis <br />Three-Component TSM Proposal <br />TH 12 Roadway Corridor Forecasted Traffic Volumes <br />Required Roadway Improvements for Three-Component <br />TSM Alternative <br />Residential and Commercial Impacts <br />PARSONS <br />BRINCKERHOFF <br />w:\longlake\report.doc