Laserfiche WebLink
gustafson design, inc.A- <br />HPT ^ tai.-;^,l ...« <br />Febmaiy 20,1996 4X0 <br />Ms. Jeanne A. Mabusth 3 J <br />Building and Zoning Administrator <br />City of Orono <br />P.O. Box 66 <br />Crystal Bay. MN 55323-0066 <br />- .zj <br />Dear Ms. Mabusth: <br />The concept for the Winslow pond is simply to remove the debris and <br />organic matter on the south edge of the pond to allow for water storage and use <br />by wildlife. This area of the pond is no longer anything more than mud and <br />branches where very little grows. The intention is to clean up this sludge and <br />allow for clean pond water with vegetation to grow along the edge of the pond. <br />We expect to remove approximately 80 yards of mud and debris from the <br />pond using a track excavator and to truck the material from the site. Because of <br />the amount of debris in the pond, it is expected that the loads will be light and <br />thereby reduce the possible damage to the area roads. <br />1845 Wisconsin Ave. No. Golden Valley, MN 55427 tel (612) 544-4215 <br />• *. r." iiMiii«ri< lit > a ■