Laserfiche WebLink
FPOM LSEKIH HOFFHfiH 17TH FL 04.24.1??? 09«1? <br />• • <br />I <br />(n) I Fncililatij ihc provision of wireless lelecopimunicntioil services to <br />the i csicleiUs njia busincsics of the_______; <br />I ' <br />(b) Miniiniz^ odverso visual cn*ccts of to\>'cr» through careful design <br />Hiicl siting standards; <br />towers to accommodate(c) I Maximiz: the use of existing and approvec <br />new wireless tcU commuiiicatlon antennas in ordc| to reduce the number of <br />tONvers needed to serve the community. <br />I <br />2. Conditional Use Permit Required. It shall be jmlnwful for any person, <br />irect, coAsiruct in place, place or re-erect, or replace anyfirm, or corpbintion to <br />tower withou'i first making application to the <br />use permit titcrefor as Ii|crcinafle!r jrrovided. Routine hit inleitancc of towers and <br />related structures shall ni3t requirf the issuance of a condi iojial use jjermit. <br />d securing a conditional <br />3. CO’Clrcntion Roquircnidnts. A proposal for ft now commercial wireless <br />tclccommuniCntion scrv cc tower shall not be approved unless it can reasonably <br />be documented by the a))plicnnfthot the iclecommunlcations equipment planned <br />for the proposed tower cbnnoi be accommodated on an existing or approved tower <br />or building within a one-half mile search radius of the proposed tower due to one <br />or more of ih^ following; reasons: <br />(a) Tlic plajtncd equijiment would exceed the druclural capacity of the <br />existing or approved towW or building, as dOcu ncnled by a competent <br />radio frequency Engineer;- <br />I » <br />(b) I'lie plai)ned equipment would cau$e interference materially <br />impacting the usability of other existing or plaiuie J equipment at the lower <br />or building ns dobumented by a competent radio frequency engineer; <br />(c) r.xistlng ^r approved towers and buildiqgs witliin tlie search radius <br />cannot accommodate the planned equipment a <br />function reasonably os documented by a qualified <br />I <br />(d) I In spile df best efforts, within 60 days, ll <br />nogollale reason ible busjncss terms regarding t ic lease or purchase of <br />a height necessary to <br />jngincer; <br />e applicant is unable to <br />space'on an cxisljng lowcf; or <br />(e) Other reasons affecting technical performance, system coverage, <br />aiul system enpadity that |nakc it impractical to place or locate the planned <br />iclccojiimuniculiiuis equipment upon an existing or approved tower. <br />4. Towei* Design licqulrcnjients. Proposed constriction or modification of <br />towers sliall meet the following design requirements: ; <br />I <br />2. <br />P. 6 <br />!i