My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-25-1996 Council Packet
Orono
>
City Council
>
1996
>
03-25-1996 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2023 4:15:25 PM
Creation date
8/31/2023 4:10:51 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
265
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
HUESKER inc. <br />MEMBER or <br />GEOSYNTHETIC <br />R esearch <br />Institute <br />& <br />r t <br />fortrac geogrids <br />INSTALLA <br />insudliition and they <br />violet exposure. <br />The primary reinforcing direcUon for aU Fortrac geogrids is in the long diiecUon of the <br />roll (also called the machine direction). <br />Fortrac geo<>rids are shipped to the jobsite in tolls; they ate encased in a plasUc wrap. <br />U^fthe wmp on the Zs until ready for use. TOs will protect the gnd from <br />unnecessary exposure and damage. <br />Prenaration: <br />nie contractor should excavate to the lines and grades shown on the project gtadmg <br />plans. The contractor should take precautions to minimize ovet e.xcavauon. <br />Cmmitaiinn Snil Pienarago" fnr Reinforced .SoilZflnS <br />The foundation sod shall be excavated as required for <br />« shown on the construcUon drawings or as duected by the <br />Siriw engLr T.;e foundaUon soU should be tested by the owner to assure tot the <br />Uu=l foundation sod st ength meets or exceeds the assumed design <br />Soils not meeUng the te>;ed suength should be removed and replaced with sod <br />meeting the design criteria. <br />q^norid Placement <br />The Foruac geoarid should be instaUed at the proper elevadon and orientation as shown <br />in the wad details on the project construction plans or as directed by the w <br />Engtoefcut the geogrid to the specified length as shown in the engmeers drawmgs <br />uf^toaiy reinfoming direction should be placed perpendicular to the wad face and <br />should be one continuous piece of raatenai. <br />End Dieces of geogtid too short to cover the fud expanse of the reinforced section shouU <br />d^arded or held for use on shorter sections. Adjacent secUons of geognd should be <br />butted in a manner to assure 100% coverage after placement <br />1 <br />11107A South Commerce 0lvd. . P O. Bo* 41 1 529 • Char lone. NC 20241 . Teleohone (704| 588-5500 / (800) 942-9418 • Fax (704) 588-5988
The URL can be used to link to this page
Your browser does not support the video tag.