My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-25-1996 Council Packet
Orono
>
City Council
>
1996
>
03-25-1996 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2023 4:15:25 PM
Creation date
8/31/2023 4:10:51 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
265
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Zoning Application #2114 <br />March 1 1, 1996 <br />Page 3 <br />2.Should special landscaping be required at the top of the second tier of retaining wall to <br />minimize danger to users of lakeshore yard ot property? <br />Ceil Strauss of the DNR called to discuss the application and advised that since wall <br />is located within the 0-75' setback area that some type of planting should be installed <br />to minimize visual impact of two-tiered retaining wall from lake. <br />3.Are there other solutions to a two-tiered retaining wall? If bank was to be gradually <br />sloped back from County road, major retaining walls would be required along sides to <br />uphold higher elevations of adjacent properties. WTiat other solutions are available to <br />applicant? <br />4. Other issues raised by Planning Commission. <br />Options of Action <br />To either approve or amend the current proposal. Any condition of approval must include the <br />followimi conditions; <br />Applicant to obtain a permit from Hennepin County DOT for work conducted <br />within County right-of-way. Applicant to also include a planting schedule for <br />type of plantings to be installed at first and second tier of retaining walls. <br />City Engineer to review final grading and construction plan upon application for <br />building permit. Applicant's contractor to submit information on structural <br />capacity of helix earth anchors. <br />Applicant's contractor to contact City stall at least 48 hours before installation <br />of retaining walls. <br />4. Erosion control shall be in place during construction until groundcover is <br />restored. <br />Isv
The URL can be used to link to this page
Your browser does not support the video tag.