My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-21-1997 Planning Packet
Orono
>
Planning Commission
>
1997
>
04-21-1997 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2023 4:06:04 PM
Creation date
8/31/2023 3:59:27 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
350
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1 <br />! <br />Wolsfeld Creek <br />Dickey Lake Creek <br />H.\RDCOVER ANALYSIS <br />4. Section 10.22, SuM. 2, Lakeshore Hardcover <br />Distance <br />from <br />Shoreline <br />Total Area in <br />Setback <br />Hardcover <br />Allowed <br />Existing <br />Hardcover <br />Proposed <br />Hardcover <br />Variance <br />Request <br />0 ’-75’4,540 sq. ft.None 220 sq. ft. <br />(4.8%) <br />390 sq. ft. <br />(8.6%) <br />390 sq. ft. <br />(8.6%) <br />The proposed boulder retaining wall and granite stairway increase hardcover from 220 sq. ft. or 4.8% <br />to 390 sq. ft. or 8.6% where none is allowed. <br />Description of Request <br />The applicant has indicated that he wants to replace an existing stairway made of railroad ties with <br />a granite stairway. The applicant also wants to have a retaining wall at the shoreline constructed of <br />boulders for a more natural appe; ranee. <br />Issues <br />1. This is an after-the-fact application. <br />2. It is difficult to quantify the stability of the random boulders. <br />3. The proposed stairway and retaining wall require a hardcover variance of 390 sq. ft. or 8.6% <br />Staff Recommendation <br />To approve the hardcover variance and conditional use permit, subject to the following: <br />1.The voids between the boulders shall be filled with topsoil and vegetative growth to prevent <br />piping and erosion. <br />2.Good boulder to boulder contact shall be established during construction. If the boulders <br />come loose in the future, they shall be replaced in their original position. <br />U2222 Joseph Vochko <br />2925 Casco Point Road <br />4/21/97 <br />page-3
The URL can be used to link to this page
Your browser does not support the video tag.