My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-17-1997 Planning Packet
Orono
>
Planning Commission
>
1997
>
03-17-1997 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2023 3:53:32 PM
Creation date
8/31/2023 3:45:12 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
413
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
L <br />March 13,1997 <br />Page 6 <br />#2212 Rebers - Preliminary Subdivision <br />also be granted for future use, since that was not done when Outlot D was platted. It is <br />appropriate to request that as part of this application. <br />Staff Recommendatii ~i <br />Staff recommends approval of conversion of Outlot E to buildable lot status and renaming as <br />Lot 1, Block 1, Sugar Woods Second Addition only under the following conditions: <br />T IW , ^ ^ ^ <br />Lot 1 is precluded from having direct access only to Highway 12, and is precluded from <br />accessing directly to 12 via the Wear property. <br />1. <br />2. <br />3. <br />5. <br />The frontage road in Outlot D must be built prior to or in conjunction with development <br />in Lot 1, per Condition #4 of Resolution #2653. <br />In spite of the potential limitations stipulated in the City’s road easements, construction <br />of the frontage road from Willow Drive to at least the east boundary of Outlot E, must <br />occur in conjunction with development in Lot 1. If the easements are ultimately <br />deemed as not allowing this to occur until the frontage road can be completed through <br />to Brown Road, then development of Lot 1 shall not le allowed until the frontage road <br />is fully constructed. <br />4. Rebers shall grant the City a drainage and utility easement over Outlot D. <br />A triangular segment of right-of-way shall be platted as an outlot per Exhibit N, and <br />applicant shall grant to the City road, drainage and utilities easements over it. <br />i
The URL can be used to link to this page
Your browser does not support the video tag.