My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-14-2023 Council Packet
Orono
>
City Council
>
2023
>
08-14-2023 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2023 2:19:01 PM
Creation date
8/30/2023 1:55:24 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
225
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1..0AT CITY OF ORONO <br />RESOLUTION OF THE CITY COUNCIL <br />l C NO. 7373 <br />4KESH0T- <br />iv. Over all pipes, swales, and ditches providing a drainage path for multiple <br />properties. <br />b. A Drainage Easement shall be granted over all wetlands, creeks, and buffers on the <br />Property. <br />c. Driveway Easement and Maintenance Agreements. <br />B10. Upon evidence of resettlement history, the Developer shall cease all activity and contact the <br />City and the State Historical Preservation Office prior to proceeding. <br />B11. Development Fees are based on the 2023 Fee Schedule: <br />a. Stormwater and Drainage Trunk Fee: $8,060.00 per lot in a 2-acre zone. SWDT Fee due <br />8,060 x 2 lots = $16,120.00. <br />b. Park Dedication Fee: [$7,925.73 x 1 new lot] = $7,925.73. <br />B12. Plans and Specifications. The following plans and specifications shall be submitted for review <br />and approval by the City and other appropriate jurisdictions prior to final plat approval, to ensure <br />that the proposed plat will accomplish the intended purposes: <br />a. Final grading, drainage and erosion control plan showing existing and proposed contours, <br />anticipated building locations, elevations, stormwater facilities and calculations, utilities <br />and erosion control measures to be used during construction. Final Plat Approval will not <br />be granted until the MCWD has approved the stormwater management plans. <br />b. Final sanitary sewer plans. <br />c. Final stormwater management plan, if applicable. <br />d. Final stormwater pollution prevention plan (SWPPP), if applicable. <br />e. Final plans for installation of the development identification monument sign, if applicable. <br />A separate Sign Permit is required prior to installation. <br />f. Sufficient detail to meet the recommendations of the City Engineer. <br />B13. Developer shall execute a Developer's Agreement for construction of improvements on the <br />Property to ensure all site improvements are installed to the City's specifications and satisfaction. <br />Said Developer's Agreement may contain additional conditions not noted in this Preliminary Plat <br />Approval resolution. <br />a. No land alterations can take place until erosion control is established and the City is in <br />receipt of a final grading. <br />b. No improvements can begin until the City Engineer has approved all improvement plans. <br />c. No improvements can begin until 24 hours after the Plat has been recorded with <br />Hennepin County. <br />d. A Letter of Credit must accompany a fully executed Developer's Agreement written to <br />150% of the cost of the proposed site improvements. <br />5
The URL can be used to link to this page
Your browser does not support the video tag.