My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-14-2023 Council Packet
Orono
>
City Council
>
2023
>
08-14-2023 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2023 2:19:01 PM
Creation date
8/30/2023 1:55:24 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
225
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />6 <br />227533v1 <br />of the Contract, as determined by the City, the City will execute a recordable certificate of completion <br />confirming such completion and release of the Land from provisions of this Contract relating thereto. <br /> <br />18. City Engineering Administration and Construction Observation. Developer shall pay <br />a fee for engineering administration. City engineering administration will include monitoring of <br />construction observation, consultation with Developer and its engineer on status or problems <br />regarding the project, coordination for final inspection and acceptance, project monitoring during <br />the warranty period, and processing of requests for reduction in the Security. Fees for this service <br />shall be at standard hourly rates. These fees shall be billed monthly. <br /> <br />19. Storm Water and Drainage Trunk Fee. The Property is subject to a Storm Water and <br />Drainage Trunk Fee of $8,060.00 per lot, for a total of $16,120.00. (2 lots x $8,060.00 = <br />$16,120.00) <br /> <br />20. Park Dedication Fee. The Property is subject to a Park Dedication Fee of $7,925.73 for <br />one new lot. (1 lot x $7,925.73 = $7,925.73) <br /> <br />21. Sanitary Sewer Charges. The Project is subject to Sanitary Sewer Charges totaling <br />$15,730.00, based on the 2023 Orono Fee Schedule, as follows: <br /> <br />A. Metropolitan Council SAC Fee: $2,485.00 per lot (due at the time of Final Plat) <br />($4,970.00) <br />B. Connection Permit: $50.00 per lot (due at the time of individual building permits) <br />C. Connection Inspection fee: $100 per lot (due at the time of individual building permits) <br />D. Connection Fee: $5,380.00 per lot due at the time of Final Plat) ($10,760.00). <br /> <br />22. Final Plat Fee. The Project is subject to a Final Plat fee of $550.00, based on the 2023 <br />Orono Fee Schedule. The City acknowledges that Developer has already paid $500.00 of this fee. <br /> <br />23. Landscaping. No landscaping plan is associated with this Plat. <br /> <br />24. Summary of Security Requirements. The terms of this Contract, payment of the costs <br />of all Improvements and construction of all Improvements, the Developer shall furnish the City <br />with security in form acceptable to the city attached hereto as Exhibit C (the "security"), equal in <br />amount to 150% of the cost of the Improvements, including any required landscaping. The amount <br />of the security shall be $119,220.00. The amount of the security includes all of the security <br />requirements set forth in this Contract, and was calculated as follows: <br /> <br />Construction Costs: <br />Sanitary Sewer Installation = $79,4800.00 <br />Total Security (Construction Costs x 150%) = $119,220.00 <br /> <br />The bank shall be subject to the approval of the City Administrator. The City may draw down the <br />security, upon five (5) business days' prior written notice to Developer, for any violation of the <br />terms of this Contract. Amounts drawn shall not exceed the amounts necessary to cure the default. <br />If the Improvements are not completed at least thirty (30) days prior to the expiration of the DRAFT
The URL can be used to link to this page
Your browser does not support the video tag.