My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-28-2023 Council Packet
Orono
>
City Council
>
2023
>
08-28-2023 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2023 1:54:40 PM
Creation date
8/30/2023 1:51:18 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
358
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
AGENDA ITEM <br /> <br />Prepared By: Reviewed By:AMC Approved By: <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />1. Purpose. The purpose of this action item is to formally seek council approval of a new bult water <br />fill station at the new Public Works Facility. <br /> <br />2. Background. Currently the public works department issues and sells bulk water by issuing portable <br />meters that contractors use to hook to city fire hydrants. While the system works, it does expose the city <br />hydrants to risk if used improperly and depends on an honor system for the true reporting of bulk water <br />used. Paper slips must then be processed by the city staff to create invoices. During the design of the <br />new public works facility, the design team added the ability to provide an automated bulk water station. <br />The station works much like a gas pump in that users could enter a city issued code to track their water <br />usage. While the basic plumbing to support the system is included in the new facility, the valves, <br />controllers, panel, and automation is not. The station also reduces issues with hydrant and water system <br />damage. <br /> <br />3. Cost. Staff solicited quotes for the installation of the system and the control panel. <br />Vendor Item Cost <br />Ebert Construction Plumbing-Installation and testing of valves, pipe and RPZ $31,264.48 <br />Quality Flow Systems Installation of Panel, flowmeter and associated automation $12,530.00 <br />TOTAL $43,794.48 <br /> <br />4. Funding. The bulk water station will be funded from the Water Fund. <br /> <br />5. Staff Recommendation. I recommend approval installation of an automated bulk water issue station. <br />Use of a dedicated an automated system will reduce instances of damage to fire hydrants and the water <br />systems, as well as improve the city’s accountability of Bulk water sales. <br /> <br />COUNCIL ACTION REQUESTED <br />Move to approve purchase and installation of the bulk water station. <br /> <br />Exhibits <br />A. Plumbing proposal <br />B. Water station proposal <br />Item No.: 11 Date: August 28, 2023 <br />Item Description: Bult Water Filling Station <br />Presenter: Adam T. Edwards, P.E. <br />City Engineer <br />Agenda <br />Section: <br />City Engineer Report
The URL can be used to link to this page
Your browser does not support the video tag.