Laserfiche WebLink
227600v1 <br />21 <br /> <br /> <br />.2 Percentage Basis <br /> (Insert percentage value) <br /> <br /> « » (« » ) % of the Owner’s budget for the Cost of the Work, as calculated in accordance with <br />Section 11.6. <br /> <br />.3 Other <br /> (Describe the method of compensation) <br /> <br />« » <br /> <br />§ 11.2 For the Architect’s Supplemental Services designated in Section 4.1.1 and for any Sustainability Services <br />required pursuant to Section 4.1.3, the Owner shall compensate the Architect as follows: <br />(Insert amount of, or basis for, compensation. If necessary, list specific services to which particular methods of <br />compensation apply.) <br /> <br />« » <br /> <br />§ 11.3 For Additional Services that may arise during the course of the Project, including those under Section 4.2, the <br />Owner shall compensate the Architect as follows: <br />(Insert amount of, or basis for, compensation.) <br /> <br />« » <br /> <br />§ 11.4 [Reserved.] <br /> <br />« » <br /> <br />§ 11.5 When compensation for Basic Services is based on a stipulated sum or a percentage basis, the proportion of <br />compensation for each phase of services shall be as follows: <br /> <br />Schematic Design Phase « twelve » percent ( 12 %) <br />Design Development Phase « twenty-eight » percent ( « 28 » %) <br />Construction Documents <br />Phase <br />« thirty-six » percent ( « 36 » %) <br />Procurement Phase « two » percent ( « 2 » %) <br />Construction Phase « fifteen» percent ( « 15 » %) <br /> <br />Total Basic Compensation one hundred percent ( 100 %) <br /> <br />§ 11.6 When compensation identified in Section 11.1 is on a percentage basis, progress payments for each phase of <br />Basic Services shall be calculated by multiplying the percentages identified in this Article by the Owner’s most <br />recent budget for the Cost of the Work. Compensation paid in previous progress payments shall not be adjusted <br />based on subsequent updates to the Owner’s budget for the Cost of the Work. <br /> <br />§ 11.6.1 When compensation is on a percentage basis and any portions of the Project are deleted or otherwise not <br />constructed, compensation for those portions of the Project shall be payable to the extent services are performed on <br />those portions. The Architect shall be entitled to compensation in accordance with this Agreement for all services <br />performed whether or not the Construction Phase is commenced. <br /> <br />§ 11.7 The hourly billing rates for services of the Architect and the Architect’s consultants are set forth below. The <br />rates shall be adjusted in accordance with the Architect’s and Architect’s consultants’ normal review practices. <br />(If applicable, attach an exhibit of hourly billing rates or insert them below.) <br /> <br />« Attached» <br />