My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-28-2023 Council Packet
Orono
>
City Council
>
2023
>
08-28-2023 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2023 1:54:40 PM
Creation date
8/30/2023 1:51:18 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
358
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
227600v1 <br />7 <br /> <br /> <br />the Owner’s consultants, and for approval of submissions by authoritie s having jurisdiction over the Project. Once <br />approved by the Owner, time limits established by the schedule shall not, except for reasonable cause, be exceeded <br />by the Architect or Owner. With the Owner’s approval, the Architect shall adjust the schedule, i f necessary, as the <br />Project proceeds until the commencement of construction. <br /> <br />§ 3.1.4 The Architect shall not be responsible for an Owner’s directive or substitution, or for the Owner’s acceptance <br />of non-conforming Work, made or given without the Architect ’s written approval. <br /> <br />§ 3.1.5 The Architect shall contact governmental authorities required to approve the Construction Documents and <br />entities providing utility services to the Project. The Architect shall respond to applicable design requirements <br />imposed by those authorities and entities. <br /> <br />§ 3.1.6 The Architect shall assist the Owner in connection with the Owner’s responsibility for filing documents <br />required for the approval of governmental authorities having jurisdiction over the Project. <br /> <br />§ 3.2 Schematic Design Phase Services <br />§ 3.2.1 The Architect shall review the program and other information furnished by the Owner, and shall review <br />laws, codes, and regulations applicable to the Architect’s services. <br /> <br />§ 3.2.2 The Architect shall prepare a preliminary evaluation of the Owner’s program, schedule, budget for the Cost <br />of the Work, Project site, the proposed procurement and delivery method, and other Initial Information, each in <br />terms of the other, to ascertain the requirements of the Project. The Architect shall notify the Owner of (1) any <br />inconsistencies discovered in the information, and (2) other information or consulting services that may be <br />reasonably needed for the Project. <br /> <br />§ 3.2.3 The Architect shall present its preliminary evaluation to the Owner and shall discuss with the Owner <br />alternative approaches to design and construction of the Project. The Architect shall reach an understanding with the <br />Owner regarding the requirements of the Project. <br /> <br />§ 3.2.4 Based on the Project requirements agreed upon with the Owner, the Architect shall prepare and present, for <br />the Owner’s approval, a preliminary design illustrating the scale and relationship of the Project components. <br /> <br />§ 3.2.5 Based on the Owner’s approval of the preliminary design, the Architect shall prepare Schematic Design <br />Documents for the Owner’s approval. The Schematic Design Documents shall consist of drawings and other <br />documents including a site plan, if appropriate, and preliminary building plans, sections and elevations; and may <br />include some combination of study models, perspective sketches, or digital representations. Preliminary selections <br />of major building systems and construction materials shall be noted on the drawings or described in writing. <br /> <br />§ 3.2.5.1 The Architect shall consider sustainable design alternatives, such as material choices and building <br />orientation, together with other considerations based on program and aesthetics, in developing a design that is <br />consistent with the Owner’s program, schedule and budget for the Cost of the Work. The Owner may obtain more <br />advanced sustainable design services as a Supplemental Service under Section 4.1.1. <br /> <br />§ 3.2.5.2 The Architect shall consider the value of alternative materials, building systems and equipment, together <br />with other considerations based on program and aesthetics, in developing a design for the Project that is consistent <br />with the Owner’s program, schedule, and budget for the Cost of the Work. <br /> <br />§ 3.2.6 The Architect shall submit to the Owner an estimate of the Cost of the Work prepared in accordance with <br />Section 6.3. <br /> <br />§ 3.2.7 The Architect shall submit the Schematic Design Documents to the Owner, an d request the Owner’s <br />approval. <br /> <br />§ 3.3 Design Development Phase Services <br />§ 3.3.1 Based on the Owner’s approval of the Schematic Design Documents, and on the Owner’s authorization of <br />any adjustments in the Project requirements and the budget for the Cost of the Work, the Architect shall prepare <br />Design Development Documents for the Owner’s approval. The Design Development Documents shall illustrate and
The URL can be used to link to this page
Your browser does not support the video tag.