Laserfiche WebLink
AGENDA ITEM <br /> <br />Prepared By: Reviewed By: AMC Approved By: <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />1. Purpose. The purpose of this action item is gain council approval for the attached contract for <br />Architectural services. <br /> <br />2. Background. In 2022 the city completes a facility future use study for the existing/old public works <br />facility. The study looked at use of the facility for either a fire station or a recreation facility. A copy of <br />the study results is at Exhibit A. As part of the Fire Needs Assessment staff analyzed potential facilities <br />needs to support the future fire department using the existing fire stations. Resolution 7375 directed staff <br />to solicit design proposals for remodeling the old public works facility for potential use as a fire station <br />and a facility study on the existing stations. Staff solicited a proposal for Oertel Architects, the design <br />firm for our new public works facility and author of the future facility study. Their proposal is at Exhibit <br />B is soliciting proposals for facilities studies of the exiting stations. Current litigation may hamper access <br />to exiting facilities to complete the studies. At the July 24th, 2023 Meeting Council directed staff engage <br />with Oertel Architects to provide architectural services for a design proposal to remodel the old public <br />works as a temporary fire station. <br /> <br />3. Costs. Oertel provided a draft contract for architectural services for the remodel of the public works <br />building. This is based on their original proposal for design services for the building to be a permanent <br />fire facility but we will manage the contract by authorizing it in phases. <br />Work Cost <br />Schematic Design Phase $ 35,414.40 <br />Total Cost of architect services if project proceeds to a full $3.3M remodel $ 295,120.00 <br /> <br />4. Funding. The Facilities bonding included $3,000,000 for potential fire facilities. <br /> <br />5. Staff Recommendation. I recommend approval of the attached contract and authorization of the <br />Schematic design phase. During this phase we will determine the needs for the facility to be used as a <br />temporary fire station. We will also be able if necessary to analyze the needs for any temporary facility <br />needs in the Navarre area during this phase. <br /> <br />COUNCIL ACTION REQUESTED <br />Move to approve the contract with Oertel at Exhibit A authorizing work associated with the Schematic <br />Design Phase. <br /> <br />Exhibits <br />A. Draft Contract with Oertel <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Item No.: 10 Date: July 24, 2023 <br />Item Description: Old Public Works Facility Remodel (23-044) - Architect Contract <br />Presenter: Adam T. Edwards, P.E. <br />City Engineer <br />Agenda <br />Section: <br />Consent Agenda