Laserfiche WebLink
y;> * '.> * <br />A'- <br />> •’ <br />r <br />•V^.L <br />9 ; !?«^Wneh^ <br />.f <br />4 <br />Ct/ <br />-4^ <br />4 <br />■•V <br />'■4- <br />U-^‘ <br />r/* ; <br />*. r <br />I <br />• • <■% <br />Item <br />1 niter refurbishment - <br />2 Softening unit control replacement t- <br />3 Chlorine solution water line relocation <br />4 Brine storage tank cleaning <br />5 Softening unit renovation . • • <br />6 Softening unit discharge meters <br />7 Electrical systems replacement 9 <br />8 Automatic control valve replacement <br />9 Ventilation/dehumidification improvements <br />10 Controls replacement (SCADA)% ' <br />11 Piping replacement 0 <br />/ * •: i' A r' 't v S / <br />4^ ■ <br />''r*!.Vr , < <br />r-vs <br />% <br />Jf <br />A <br />*C*i <br />% <br />f** <br />• ♦ <1 <br />J . <br />i <br />% <br />VO WO' -V <br />: 5 I I Item Estimated Cost I <br />'< <br />.- P <br />4 <br />•> <br />•V <br />4 <br />1 <br />Item Estimated Cost <br />1 Filter refurbishment $220,900 <br />2 Softeninq unit cxxitrol replacement 17.000 <br />3 Chlorine solution water line relocatKXi 0.500 <br />4 Brine storage tank cleaning 8.000 <br />5 Softening unit renovation 79.900 <br />6 Softening unit discharge meters 23.400 <br />7 Electrical systems replacement________43.100 <br />8 Automatic control valve replacement 9.600 <br />9 Ventilation/dehumidification improvements 102.500 <br />10 Controls replacr'.ment (SCAOA)73 100 <br />11 Piping replacement 30.000 <br />12 Engineering and contingency 123 200 <br />TOTAL 739,200 <br />A <br />t«- <br />tf- <br />V <br />• ' < . » ^ ' ‘ <br />W.WL- ;• :;^• • < <br />-> :I "