Laserfiche WebLink
ALL SANITARY SEWER AND MUNICIPAL WATER CONNECTION CHARGES (If not |vevk>usly assessed or if an improvement project is not deemed to be required In the sole discretion of the City. If an improvement is required, the connection charge may be in addition to any assessment.)The connection charge for properties wishing to connect to the sewer or water but which arc located outside the delineated boundaries of the affected project area shall be charged the connection fee for that area. Such connections arc subject to City Council approval. <br />1983-1 Highway 12 Orono-Long Lake- <br />Medina <br />$ 1,225.00 <br />— <br />(1) <br />1989 Highway 12 - Phase I - North Side <br />Brown Rd to Willow Dr <br />$ 1,185.00 (1) <br />1989 Highway 12 - Phase II - Future <br />Trunk Expansion <br />$2,175.00 (1) <br />1992 Stubbs Bay Sewer <br />I Stubbs Bay NE/NW - Bayside East <br />n Bederwood <br />in Bayside North <br />IV Oxford <br />V Cygnet and Leaf <br />$14,655.00 <br />$22,685.00 <br />$19,205.00 <br />$27,110.00 <br />$21,905.00 <br />(5) <br />(5) <br />(5) <br />(5) <br />(5) <br />rRRDIT TO AREA: <br />(1) 602-37691 Sewer Operating <br />(2) 30^37691 1982 Improve & ^6 By Pass <br />(3) 310-37691 1985 Improve Crystal Bay <br />(4) 406-37691 PIR Fund jf7LS & Forcemain <br />(5) 308-37691 1992 Improve Stubbs Bay <br />(6) 311-37691 1997 Improvements