Laserfiche WebLink
Small Brush Disposal Fires <br />Minimum Lot Size: 2 acre minimum lot size <br />Maximum Fire Size: 8' diameter by 4' high <br />Building Setback: Minimum 75 ’ setback from buildings <br />Property Line Setback: 50* setback from property lines <br />Permit Time Limit: Permits valid for 30 days <br />Inspection Requirements; Inspection of initial bum site before permit issuance, inspection of <br />site before additional bums <br />Notification Requirements: Notify both Orono Police Department and the Fire Department <br />having jurisdiction before each bum. <br />Large Brush Disposal Fires <br />Minimum Lot Size: <br />Maximum Fire Size: <br />Building Setback: <br />Property Line Setback: <br />Permit Time Limit: <br />Inspection Requirements; <br />Notification Requirements: <br />5 acre minimum lot size <br />15' diameter by 6' high <br />Minimum 150' setback from buildings <br />75' setback from property lines <br />Permits valid for 30 days <br />Inspection of initial bum site before permit issuance, inspection of <br />site before additional bums <br />Notify both Orono Police Department and the Fire Department <br />having jurisdiction before each bum. <br />Fire Warden <br />The City will n^ to have a Fire Warden to administer the issuance of burning permits. The <br />DNR is responsible for open burning within the state and delegates administration to local units <br />of government though the appointment of fire wardens. Since this program will be administered <br />through the Public Services Department, we are recommending that the Public Services Director <br />be designated as the fire warden. The fire warden can then delegate the issuance of permits and <br />site inspections to other staff members. Site inspections will be conducted by inspectors in the <br />^blic services Department. The Orono police will be notified of bums and can provide assistance <br />in monitoring of bums in progress. <br />COUNCIL ACTION REQUESTED; <br />Motion to approve the proposed revisions to the City of Orono Open Burning Requirements <br />i