Laserfiche WebLink
ir <br />•:*, iv <br />l:\130M 3990\REQUEST5WB2 <br />BONISTROO AND ASSOCIATES ^612 6361311 12/02/97 17:02 01:13/1A N <br />ADO <br />65 Dircclionat bore 8‘* UDI*. *SI3R 17 LF 1010 ‘HHK>1010 90.900.00 <br />DRDnCT <br />66 8 ' HVC. SDR 35. 10'-12’ deep IJ-.400 33.00 -400 {13.2fK)00) <br />67 8” PVC. SDR 35. 12 -14' deep I.F -515 34 00 -515 <br />(17.510 00) <br />68 PVC. SDR 35. 14'. 16* deep LF -45 35.00 -45 (1,375 001 <br />H“ PVC, SDR 35. 16* 18' deep LF -50 36 (8).50 (1 .MX) 1)0) <br />7(1 Lightweight aggregate LF -1010 30.00 -lOlO C30.300.00) <br />Total deduct ($64,385.00) <br />Total Alcernaie No. .3 $26,515.00 <br />Change Order No. 1 <br />17 Directional bore 3" HOPE. SDR 11 LF 783 24.00 691 16.584.00 <br />65 Directional bore B“ HOPE, SDR 17 LF 446 ^00 376 33.840.00 <br />67 8“ PVC. SDR 35. 12 14' deep LF IIS 3400 11.5 3,9)0.00 <br />6K 8" PVC. SDR 35. 14'-16. deep LF 5 35.00 5 I75.(M) <br />70 Lightweight aggregate IJ*40 30.00 40 1.200.(K) <br />Tulul $55,709 00 <br />DEDUCT <br />1 ft- PVC. SDR 35.0' 8’ deep U--253 31.00 -253 (7,843.00) <br />16 3“ IIDPB, .SDR 11 IT .783 20.00 -783 (15.660.00) <br />66 ft" PVC. SDR 35. in .ir ileep LF -435 3300 -435 (14,355.00) <br />M K- PVC. SDR 35. 16 -18'tleep LF -26 .36 00 •26 (936 00) <br />Total ($38,794.00) <br />Total Change Order No. 1 $43,430.00 <br />Total Part 1 - .Sanitary .sewer $.M 1.413.50 <br />Total Part 2 . Restoration $69,257.25 <br />Total Change Order No. 1 $43,430.00 <br />Total Work Completed to Date $454,100.75