My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12-08-1997 Council Packet
Orono
>
City Council
>
1997
>
12-08-1997 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2023 10:43:12 AM
Creation date
8/1/2023 10:39:02 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
444
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ORONO PLANNING COMMISSION MEETING <br />MINUTES FOR JULY 21,1997 <br />(#23 - #2263 Brook Park Really - Continued) <br />Bill Gleason asked how the determination of 28 units was made. Gaffron said it was determined <br />by the dry buildable and would result in 28-30 units. <br />Berg said the applicant also has to consider the surrounding neighborhood. The proposal will <br />increase the traffic which has to be considered. She noted that the addition of the adjacent parcel <br />would result in the County reviewing the traffic as well. <br />McMillan indicated that with no code allowing density over 28 units, the density level cannot be <br />determined at this point. <br />Bill Gleason said they could review and re-tool the plan if rezoning was a possibility. <br />Gaffron said if the Commission would like to consider rezoning, the Council should review the <br />sketch plan first to see if they support the idea of rezoning. <br />John Gleason clarified the water and sewer connection charge of $3800 per unit. Gaffron said <br />density level would not change the unit cost. <br />(Dale Lindquist arrived at this time.) <br />SCHEDULED PUBLIC HEARINGS/PUBLIC INFORMATION REVIEWS <br />(#1) #2187 DONALD AND ROBIN HELGAGER <br />3265 SIXTH AVENUE NORTH <br />VARIANCES <br />PUBLIC HEARING 7:12-7:24 P.M. <br />The Applicant, Robin Helgager, along with Neil Hcupel, were present. <br />Gaffron reported that the application is a continuation of a public hearing for remodeling of the <br />residence. The applicant recei. . approval for a 5’ east lot line setback in 1996 and removal of <br />the existing dctacned garage and addition of an attached garage, a family room, and a change in <br />the driveway. A revised proposal was reviewed early in 1997. Gaffron indicated that the <br />property requires a 50' setback from CoRd 6, 150’ setback from Lake Cleissen, a 30' side setback, <br />all of which leaves little room for expansion of the footprint. The lakeshore setback requirement <br />has increased since the original residence was built.
The URL can be used to link to this page
Your browser does not support the video tag.