My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12-08-1997 Council Packet
Orono
>
City Council
>
1997
>
12-08-1997 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2023 10:43:12 AM
Creation date
8/1/2023 10:39:02 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
444
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ORONO PLANNING COMMISSION MEETING <br />MINUTES FOR JULY 21,1997 <br />y <br />s, <br />(#23 - #2263 Brook Park Realty - Continued) <br />Gaffron reviewed the memo regarding wetlands, hardcover limitations, engineering issues, and <br />sewer and water cormection charges. There is a concern about possible wetland encroachment <br />along the west side. The wetlands require confirmation and may require some restoration. There <br />is a 35% hardcover limit for a PRD in the LR-IC District. A letter is included from the City <br />engineer regarding the proposal. The preliminary determination for sewer and water connection <br />charges is approximately $3800 per unit. The memo also outlines PRD standards for <br />consideration. Gaffron informed the Commissioners that under a PRD they have the opportunity <br />to create w'hat they would like to see for such a development and give direction to the developer. <br />The applicants were asked to comment. <br />Bill Gleason indicated that they had been unaware of the limitations on the property being <br />adjacent to the LR District. It is their plan to develop affordable housing tlirough higher density. <br />A portion of the development plan is laid out on neighboring property not yet acquired or part of <br />this proposal. He noted there is a driveway currently crossing over wetlands. The wetlands will <br />be preser\’ed. Entry into the property would be from Livingston Avenue. <br />Gleason said his goal is to provide a lower unit cost through higher density. He proposes a umt <br />would cost about $135,000 or less if the 48 unit density was allowed. Gleason said they would <br />redo the plan if the 48 unit plan was not allowed. Each unit will include two bedrooms, two <br />bathrooms, a double garage, central air conditioning, and appliances. There will be a front entry <br />with garage entry on the other side. There will be four units per building. <br />There were no public comments. <br />Smith asked if the applicant had reviewed the letter from the City Engineer. Gleason said he had <br />no issue with the contents of the letter. He said he thought the driveway may be a problem. <br />John Gleason asked what would be involved with restoration. Gaffron said it would likely <br />include reexcavation and revegetation. Gaffron said the driveway has been a long standing issue <br />for the City as it encroaches on property being developed and needs to be resolved. He felt it <br />was resolvable. <br />Hawn asked what the cost figure.*: are for affordable housing. Gaffron said the top of the <br />affordable range is a $120,000 valuation, which results in the estimated $135,000 cost per umt <br />not meeting tlie affordable criteria. More density would be required to reduce the cost.
The URL can be used to link to this page
Your browser does not support the video tag.