My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-24-1997 Council Packet
Orono
>
City Council
>
1997
>
11-24-1997 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2023 10:37:11 AM
Creation date
8/1/2023 10:35:08 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
229
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
r <br />3. <br />4. <br />5. <br />6. <br />The proposed plat consists of three residential lots each meeting the minimum <br />requirement of two acres of dry buildable area. Lots 1 and 2 meet the required lot <br />width of 200' at the rear of the 50’ front/street setback line. Per Zoning Code <br />Section 10.28 Subd. 5B, Lot 3 requires a variance of 20' or 10% because it is only <br />180' in width at the rear of the 50' front/street setback line. Lot 3 contains an <br />existing residence. <br />Lot 1 is by definition a 'back lot’ and meets 150% of the lot area requirement of <br />the RR“1B Zoning District. By definition the east line of Lot 1 is the front lot line, <br />which for a back lot normally requires 150% of the 50' RR-IB front setback for <br />the principal residence, or 75' per Subdivision Code Section 11.31 Subd. 5. At <br />its September 15, 1997 meeting the Planning Commission recommended approval <br />of a front setback variance for Lot i, finding that due to the orientation of Lots 1 <br />and 2, there will be no impact on Lot 2 by constructing a residence on Lot 1 only <br />50' from its front lot line rather than the required 75', and this relaxed setback <br />requirement will allow construction of a residence on Lot 1 to mmimize impacts <br />to the steep slope to the west of the proposed house site. The south line of Lot 1 <br />is its side lot line, and the subdividers have agreed to a minimum 50' setback for <br />construction along that line where a 45' setback would normally be required for <br />this back lot, as additional buffer to the adjacent property. <br />All three lots have been found to have adequate and suitable soils for on-site <br />sewage treatment systems. The On-Site Systems Manager has approved a variance <br />for setback to the wetland on Lot 2 for three of the six identified drainfield sites. <br />Lot 3 will continue to be served by the existing easement driveway access to the <br />private segment of Lyman Avenue. Lots 1 and 2 will access the public portion of <br />Lyman Avenue via Outlot B, a shared private driveway corridor. This requires a <br />variance to Subdivision Regulations Section 11.33, Subd. 4 which would require <br />a 3-lot subdivision to be served by a 24'-28' paved read system. The public <br />portion of existing Lyman Avenue is paved at a 12-15' width currently serving 8 <br />homes with a potential of 3-4 additional homes. The private portion of Ljmian <br />Avenue, which will continue to be used by Lot 3, is a 12’ gravel driveway serving <br />5 homes with a potential for 1 or 2 additional homes. Planning Commission at <br />their September 15, 1997 meeting concluded that the two new building sites can <br />Page 2 of 8
The URL can be used to link to this page
Your browser does not support the video tag.